
How to perform Automatic Tests
Note for PATGuard Plus Users
Re-test periods are downloaded with test results and are compared
with re-test periods of existing Assets on PATGuard Plus or used as
the re-test period for new Assets. This is to ensure that re-test
periods are ‘synchronized’ across the PAT system.
Asset Upload from PATGuard Plus will also include the re-test period
Test Settings
--SELECT TEST SETTING--
DEFAULT SEQUENCE
USE TESTCODES
A. 230V HH / PORT 1
B. 230V HH / PORT 2
C. IT EQUIPMENT 1
The user has the ability to:-
- Set a specific test sequence by selecting DEFAULT SEQUENCE
- Allow Testcodes to determine the test to be carried out
- Use preprogrammed sequences for specific EUTS, e.g. IT
Equipment.
Selecting either of the first two options allows settings to be altered.
Selecting any of the remaining options allows the user to commence
immediately with that test.
Press the keyboard shortcut or use the cursor keys to highlight a Test
Sequence and press Enter to select the desired sequence.
18
Summary of Contents for Supernova Plus
Page 8: ......
Page 56: ...How to view Test Results appears to the software as a Usercode 48...
Page 114: ...Testcode Tables 106...