
OPTIONAL PROCEDURE 3.3
– THREE TOGGLE SWITCHES
SeaPerch ROV Construction Manual
– Version 2010-04NW
3.3-4
14.
Take the spliced bundle of three
red “+” wires, and twist the bundled end onto the
wire from the positive (ribbed / marked / copper) side of the speaker wire. Take
the spliced bundle of three
black “
–
” wires and twist the bundled end onto the wire
from the negative (smooth / unmarked / silver) side of the power cord. Solder the
two connections, and cover them each,
separately
, with electrical tape, as shown
in Figure 3.3-7. Figure 3.3-1 shows the completed power cord assembly
installed in the control box.
Figure 3.3-6:
Power Cord Strain-Relief Knot in Control Box
Figure 3.3-7:
Wire Bundles Soldered to Control Box End of the Power Cord
~6” Length, Beyond Knot
Procedure 3.3 – Continued
Summary of Contents for Remotely Operated Vehicle
Page 2: ......
Page 6: ......
Page 18: ......
Page 20: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 28: ......
Page 32: ......
Page 34: ......
Page 38: ......
Page 40: ......
Page 42: ......
Page 44: ......
Page 50: ......
Page 54: ......
Page 58: ......
Page 64: ......
Page 72: ......
Page 76: ......
Page 84: ......
Page 90: ......
Page 96: ......
Page 104: ......
Page 108: ......