![Sealite SL-300-2D5 Series Installation & Service Manual Download Page 38](http://html.mh-extra.com/html/sealite/sl-300-2d5-series/sl-300-2d5-series_installation-and-service-manual_1227825038.webp)
38
Ref No.
Description
No. Required
2.1
140W Solar Panel & Frame
1
2.2
Battery Box Cage
1
2.3
Post, 150x150 minimum
Client Supplied
2.4
Steel Support
1
2.5
Steel Brace
1
2.6
Screw, 12mm x 75
12
2.7
Washer, 12mm
12
2.8
Bolt, 10mm x 25
4
2.9
Washer, 10mm
4
2.10
Self Locking Nut, 10mm
4
Figure 2. Installation of Solar Panel & Battery Box Cage
Alternative setup, using 2 x 85W
panels.
Lantern duty cycle and intensity will
determine the size and quantity of
solar panels and batteries.