www.seagullmodels.com
13
6) When you are sure that everything is
aligned correctly, mix up a generous amount of
30 Minute Epoxy. Apply a thin layer to the mount-
ing slot in the top of the fuselage and to the sides
and bottom of the vertical stabilizer mounting
area. Apply epoxy to the bottom and top edges
When cutting through the covering to re-
move it, cut with only enough pressure
to only cut through the covering itself. Cutting
into the balsa structure may weaken it.
5) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
of the filler block and to the lower hinge also.
Set the stabilizer in place and realign. Double
check all of your measurements once more be-
fore the epoxy cures. Hold the stabilizer in place
with T-pins or masking tape and remove any
excess epoxy using a paper towel and rubbing
alcohol. Allow the epoxy to fully cure before
proceeding.
CONTROL HORN INSTALLATION.
1) Locate the nylon control horns- nylon
control horn backplates and machine screws.
2)The position of elevator control horn on
the left side of elevator. The clevis attach- ment
holes should be positioned over the hinge line.
Control Horn.
Mounting Screws.
Mounting Plate.
(2) 2x20mm.
4) Mount the control horns then into the
mounting backplates. Do not overtighten the
screws or the backplates may crush the wood.
6) Install the rudder control horn using
the same method as with the elevator control
horns.
3) Using a 2mm drill bit and the control
horns as a guide, drill the mounting holes
through the elevator halves.
5) Position the rudder control horn on the
left side of the airplane.
Left side.