RENO AIR CARE YAK-11 “PERESTROIKA”
Instruction Manual.
18
3) Use a drill to drill the four holes in the
engine mount rails.
4) On the fie wall has the location for the
throttle pushrod tube (pre-drill).
5) Slide the pushrod tube in the fiewall
and guide it through the fuel tank mount.
Use medium C/A to glue the tube to the
fiewall and the fuel tank mount.
6) Connect the Z-bend in the 450mm
throttle pushrod to the outer hole of the
carburetor arm.
7) Slide the throttle pushrod wire into
the tube. Position the engine between
thmounts. Use four M4x30mm machine
screws to secure the engine to the mount
as shown.
4mm
Machine screw M4x30mm
Pushrod wire.
5
.
6
.
7
.
3
.
4
.
8
.