7
2x10mm
AILERON PUSHROD
INSTALLATION.
Please see below pictures.
Use a felt tip pen to mark the wire where
it crosses the hole. Use a pair of pliers to
put a shrp 90-degree bend in the wire at
the mark.
Mark.
.
Bend at the mark
8mm
M2 lock nut.
Metal clevis.
Snap keeper.
Snap keeper.
Servo arm.
Fuel tubing.
Hex Nut.
Nylon Snap keeper.
Summary of Contents for BEAVER TURBIN
Page 11: ...11 Collar Collar M3x4mm Epoxy M3x4mm ...
Page 24: ...Beaver Turbin Instruction Manual 24 8mm MOUNTING THE TAIL WHEEL ...
Page 25: ...25 Epoxy Insert wood piece to the back fuselage as shown ...
Page 30: ...Beaver Turbin Instruction Manual 30 M3lock nut Second Nylon washer ...
Page 31: ...31 OPTIONAL FLOAT FOR BEAVER TURBIN SEA268F ...
Page 33: ...33 3 5x20mm Thin CA ...
Page 41: ...41 ...