Beaver Turbin
Instruction Manual.
16
1) With the muffler, needle valve, and spark/
glow plug removed from the engine, slide
the cowl in place over the engine. Temporar-
ily install the propeller and spinner in order
to find the exact location of the cowl. When
satisfied with the cowl placement, secure the
cowl to the fuselage using masking tape.
Needle valve.
3x10mm
2) Install the muffler and muffler extension
onto the engine and make the cutout in the
cowl for muffler clearance. Connect the fuel
and pressure lines to the carburetor, muffler
and fuel filler valve. Secure the cowl to fuse-
lage using the M3x10mm screws.
ELECTRIC POWER CONVERSION.
1) Locate the items necessary to install
the electric power conversion included
with your model.
2) Recommend the items necessary to in-
stall the electric power conversion parts
included with your model.
3) Attach the electric motor box to the
firewall suitable with the cross lines
drawn on the electric motor box and fire-
wall. Using M4x20mm to secure the mo-
tor box to the firewall. Please see pictures
below.
- Motor: 2000 - 2700 Watt
- Propeller: 17x 8 ~ 19x10
- ESC: 85A-110A
- Lipo Batteries: 8S - 10S
Summary of Contents for BEAVER TURBIN
Page 11: ...11 Collar Collar M3x4mm Epoxy M3x4mm ...
Page 24: ...Beaver Turbin Instruction Manual 24 8mm MOUNTING THE TAIL WHEEL ...
Page 25: ...25 Epoxy Insert wood piece to the back fuselage as shown ...
Page 30: ...Beaver Turbin Instruction Manual 30 M3lock nut Second Nylon washer ...
Page 31: ...31 OPTIONAL FLOAT FOR BEAVER TURBIN SEA268F ...
Page 33: ...33 3 5x20mm Thin CA ...
Page 41: ...41 ...