Beaver Turbin
Instruction Manual.
22
2) Slide the vertical stabilizer back in-
place. Using a triangle, check to ensure
that the vertical stabilizer is aligned 90º
to the horizontal stabilizer.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
ELEVATOR PUSHROD
INSTALLATION.
Elevator control horn.
1) Install the elevator control horn using
the same method as with the aileron con-
trol horns.
2) Position the elevator control horn on
the both side of elevator.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
4) Elevator pushrods assembly as pictures
below.
M2 clevis.
M2 lock nut.
8mm
Epoxy.
Summary of Contents for BEAVER TURBIN
Page 11: ...11 Collar Collar M3x4mm Epoxy M3x4mm ...
Page 24: ...Beaver Turbin Instruction Manual 24 8mm MOUNTING THE TAIL WHEEL ...
Page 25: ...25 Epoxy Insert wood piece to the back fuselage as shown ...
Page 30: ...Beaver Turbin Instruction Manual 30 M3lock nut Second Nylon washer ...
Page 31: ...31 OPTIONAL FLOAT FOR BEAVER TURBIN SEA268F ...
Page 33: ...33 3 5x20mm Thin CA ...
Page 41: ...41 ...