- 36 -
1. In the premise of ensuring the safety distance, select proper installation position on the machine bed
piece, drill and tap according to dimensions shown in Fig2.8.C. Attention must be given in locating the
drilling hole to ensure that the emitter and receiver are parallel and aligned after being installed.
2. Fit KS06 upper vibration-reducer and KS06 lower vibration-reducer in the mounting hole of ZC
mounting bracket, according to the assembly direction with the emitter and receiver.
3. Fix ZC-mounting bracket located below onto the machine bed piece through M6×16 inner hexagon
screws.
4. Mount the Emitter/Receiver with vibration-reducer on the ZC-mounting bracket fixed on the machine
bed, and then mount the other ZC-mounting bracket with the upper vibration-reducer on the emitter/
receiver. Fix the upper ZC-mounting bracket through M6×16 inner hexagon screws.
5. Adjust the position of emitter and receiver, make them parallel, corresponding, aligned.
6. Fasten all installed screws after start-up test.
2) Pipe mounting (GC)
①
Bracket seat
②
Bracket arm
③
Steel pipe
④
Emitter/Receiver
⑤⑥
KS pipe-mounting fixing clamp
⑦
KS06 lower vibration-reducer
⑧
KS06 upper vibration-reducer
⑨
M5×25 inner hexagon screw, Φ5 elastic washer, M5 square nut
⑩
M8×20 inner hexagon screw, Φ8
elastic washer
⑪
M8×25 inner hexagon screw, Φ8 elastic washer
⑫
M16×45 hexagon screw, Φ16 plain/elastic washer
Fig2.9 Pipe mounting (GC)
Fig2.9.A
Fig2.9.B