12
4. inStall GUide
step 1.
ensure all components required are prepared.
step 2.
if a floor protector(hearth) is to be used, position now, refer to clearances(pg 7, 9) for a guide on
the appropriate positioning to accompany clearances and the floor protector(hearth).
step 3.
position the appliance, refer to clearances(pg, 7,9) for minimum requirements.
step 4.
Prior to proceeding ensure both the firebox and hearth are fixed in position.
step 5.
refer to flue System installation (pg 13) & aS/nZS 2918:2001.
Part a - FirEbox installation
Prior to proceeding with installation thoroughly check the materials composing the surrounding back
walls, floor and ceiling of the desired position of the firebox. Combustible heat degrading materials,
electric wiring or gas piping MUST NOT be located within the distance specified by the clearances(
pg 7,9).Ensure the flooring can support the weight of the appliance(see weight in specifications).
all preparatory working required prior to installing the appliance( external air intake etc) must be
completed before proceeding with installation.
We strongly recommend installing the appliance in a weather tight room. Dust from works may be
deposited on the appliance and burned when it is commissioned, causing the ceilings to blacken. it is
therefore recommended that all preparatory works be completed prior to installing the appliance.
FirEbox loCation