background image

10

SCREEN WINCH SYSTEM -CHECKREGISTER

In addition to manufacturer inspection guidelines, we recommendyou check your countries own legal obligations

for checking and testing of lifting equipment.

SCREEN WINCH SYSTEM PURCHASE DATE:

HALF-YEARLY CHECK

DATE

YEARLY CHECK

DATE

CHECKRESULT

(POSITIVE -NEGATIVE)

NOTES

HALF-YEARLYCHECK

Checkif rolling up and rolling down is working properly, without frictions or decelerations.
Checkthat if youcan hear the ticking noiseof the safety brake ispresent.
Checkwith the enduserthat projector lift andprojection screen(if this isthe configuration)

operate in different times(not at the sametime) .

YEARLYCHECK

Checksteel cables covered by blackPVC– nosteel wires have to be visible outside the black PVCscabbard.
Checkof the ceiling fixingbrackets of the screen winch system
Checkthat the end stopsare set properly, sothat in the rolled down position(screen winch systemcompletely open)
it remainsat least 3turnsofsteel wire onto the roller tube.
Checkthat boltsonthe bottom endsof the steel cables are tightly fixed.
Checkif rolling upand rolling downis workingproperly, without frictions or decelerations.
Checkthat if youcan hear the ticking noiseof the safety brake ispresent.
Checkwith the enduserthat projector lift andprojection screen(if this isthe configuration)

operate in different times(not at the sametime) .

Summary of Contents for SCREEN WINCH SYSTEM

Page 1: ...PROJECTION SCREEN TILL ITS BOTTOM END STOP AND THEN CUT THE POWER TO THE SCREEN MOTOR B ROLL UP ROLL UP FIRST THE PROJECTION SCREEN AND THEN CUT THE POWER TO THE SCREEN MOTOR THEN ROLL UP THE SCREEN...

Page 2: ...ce improper use 5 use of non original spare parts or not authorized in writing by Screenint 6 normal wear and tear 7 the motor is removed dismantled 8 the screen winch system has been damaged in trans...

Page 3: ...are that these 3 brackets are perfectly aligned and also mounted horizontally From the central bracket the left and right brackets have to be mounted at 98 cm distance from the central bracket see Fig...

Page 4: ...ousing as in pictures below For fixing it you will need to use the four bolts supplied with the suitable Allen key not supplied taking care that TOP is at the top side of the screen housing Fig 4 Draw...

Page 5: ...s The motor has a six core power cable NEVER CONNECT THE MAINS TO THE WIRES WHITE WHITE BLACK WHITE ORANGE Once the winch is mounted to the ceiling connect the wires brown blue and yellow green to the...

Page 6: ...m are perfectly in vertical position In case the steel cables are not perfectly vertical please move the metal ring on the beam left or right in order to position the steel cable vertically In case yo...

Page 7: ...d connect the end of output power cable of the cable coiler to the power cable that comes out of the screen housing 11 At this step you have to connect the incoming power cable of the cable coiler to...

Page 8: ...een Winch System need to be changed please proceed as follows A SETTING OF THE LOWER END STOP OPEN SCREEN WINCH SYSTEM Lower down the winch till half stroke pressing the remote control button and stop...

Page 9: ...memorize it press the button for 5 sec till the motor swivels 3 times In case of mistake repeat the procedure C USE OF THE REMOTE CONTROL Press the button in order to reach the lower end stop Press th...

Page 10: ...sistheconfiguration operate in differenttimes not at the sametime YEARLYCHECK Checksteel cablescoveredbyblackPVC nosteel wireshave tobevisibleoutsidetheblackPVCscabbard Checkoftheceiling fixingbracket...

Reviews: