Installation Checklist
17
SCOTT SAFETY
087-0038 REV L
7
Observe the installation progress screen through the installation. The Installation
times varies depending on PC performance.
8
When prompted upon successful completion of the JRE software installation, click
FINISH to complete the installation. See
Figure 14
JAVA JRE Software Installation (3 of 3)
Installing the Optional
Pump
This section provides information on installing the optional pump when powered up
or powered down and disconnecting.
The device’s Automatic Sample Draw Pump is powered by the device’s internal
battery. Typical run time with pump is 12 hours; however, environmental conditions
and alarm conditions shorten run time. If the pump is connected to the device when
the device is powered up, it is automatically recognized.
Scott Safety recommends using the pump only when the tubing and sample draw
system including hydrophobic and particulate filters in the probe assembly are
attached to avoid possible contamination of the pump.
To troubleshoot a poorly performing pump, See
“Troubleshooting the Device” on
Required items:
•
The device
•
Optional Pump
Summary of Contents for Protege
Page 1: ...Protege User Guide PROTEGE PORTABLE GAS MONITOR 087 0038 Rev L ...
Page 2: ......
Page 3: ...Protege User Guide PROTEGE PORTABLE GAS MONITOR 087 0038 Rev L ...
Page 10: ...X LIST OF TABLES 087 0038 REV L SCOTT SAFETY ...
Page 44: ...20 CHAPTER 2 INSTALLATION 087 0038 REV L SCOTT SAFETY ...
Page 60: ...36 CHAPTER 4 OPERATION 087 0038 REV L SCOTT SAFETY ...
Page 76: ...52 CHAPTER 5 MAINTENANCE 087 0038 REV L SCOTT SAFETY ...
Page 80: ...56 APPENDIX A SPECIFICATIONS 087 0038 REV L SCOTT SAFETY ...
Page 86: ...62 APPENDIX B QUICK REFERENCE 087 0038 REV L SCOTT SAFETY ...
Page 90: ...66 APPENDIX C SENSOR INFORMATION 087 0038 REV L SCOTT SAFETY ...
Page 102: ...78 INDEX 087 0038 REV L SCOTT SAFETY ...
Page 103: ......