BIN CONTROLS (Ice Level Sensors)
1. Disconnect electrical power.
2. Remove front panel.
3. Remove control box cover.
4. Locate ice chute, at the base of the chute, in
front of and behind it are two plastic bin control
mounts.
5. Slide each bin control to the left, and in the
control box, disconnect the electrical leads
connecting the bin control to the circuit board.
6. Reverse to reassemble, be certain that the bin
controls are aligned so that the ice level sensors
are visible (centered) through the holes in the ice
chute.
ICE
CHUTE
SLIDE BIN
CONTROLS IN
AND OUT
REMOVAL AND REPLACEMENT: Bin Controls
Plunger &
Valve Seat
Locking
Tab
Float Valve
RESERVOIR
1. Shut off water supply.
2. Remove front panel.
3. Remove reservoir cover.
4. Disconnect water inlet tube from reservoir inlet
fitting.
5. To remove float valve, push in on "Locking Tab"
as shown and pull valve up.
Note: The plunger/seat is available as a separate
part.
6. To remove reservoir, pull up and remove water
sensor.
7. Disconnect water outlet tubes.
8. Remove the two screws holding reservoir to
bracket.
9. Remove reservoir from ice machine.
10. Reverse steps 1-9 to reassemble.
NME650 & FME800
February 1997
Page 24