FOR THE INSTALLER: Final Check List
1. Is the ice system installed indoors in a
location where the air and water
temperatures are controlled, and where they
do not exceed the design limitations?
2. Is there an electrical service disconnect
within sight of the installed machine? Has
the voltage been checked, and compared to
nameplate requirements?
3. Have all the plumbing connections been
made and checked for leaks?
4. Has the machine and bin been leveled?
5. Is there a minimum of 6" clearance at the
rear, left, and right of the machine for proper
service access and air circulation?
6. Is the water pressure a minimum of 20
psig?
7. Has the machine been secured to the
bin?
8. Is there a water shut off valve installed
near the machine?
9. Have the shipping blocks been removed
from under the gearmotor, the top of the ice
chute, and from between the gearmotor and
the right side panel?
NME1254 & FME1504
January 2000
Page 7
Leveled?
Power
Supply?
Plumbing?
Machine
Secure To
Bin?
Drains?