background image

 

 

Summary of Contents for SPEP12V75

Page 1: ...st No Part Name QTY No Part Name QTY 1 Screw M8 16 2 14 Ring 1 2 Nozzle Holder 1 15 Cover 1 3 Motor 1 16 Screw M6 20 8 4 Pump Body 1 17 Inlet Joint 1 5 Bypass Valve 1 18 Filter 1 6 Spring 1 19 Gasket 1 7 O ring 26 5 2 65 1 20 Oil Pipe 8 Cover 1 21 Screw M5 12 4 9 Seals Assy 1 22 Cover 1 10 End Ring 9 1 23 O ring 1 11 Key 1 24 Upper LeverⅠ 1 12 Rotor 1 25 Upper Lever 2 1 ...

Page 2: ...Exploded Pump View Features Voltage 12V Power 185 Watts Duty Cycle 30 Minutes Flow Rate 20 75LPM Operating Pressure 0 14MPA Current Draw 15 A Inlet Outlet 1 BSP Drum Fitting 2 BSP Hose length 4 meters ...

Page 3: ... turned On or OFF with the Upper and Lower levers Move the Upper Lever to ON 6 Keep the nozzle in contact with the drum being filled Warning 1 The drum or container being filled should be earthed to prevent static discharge and possible fire or explosion The discharge hose is not conductive and does not provide an earth 2 Do not install additional foot valves or check valves that do not have a pre...

Page 4: ...uding temperature pressure and viscosity If the accuracy of the flow meter is compromised then a calibration should be performed Calibrating flow meters is a normal part of their maintenance and is not an indication of a fault with the unit Calibration procedure 1 Unscrew the brass calibration plug shown in diagram 1 2 Purge the system pump piping meter of air 3 Stop the flow by shutting off the n...

Page 5: ...dy and at the same time pulling it back towards the inlet in order to remove the O ring pos 17 from its seal at the outlet 5 To check the inside of the measuring chamber pos 27 remove the O ring pos 17 and divide the two half chambers containing the nutating disks 6 To reassemble the chamber reverse the procedure Be careful to verify the disk rotates freely in the chamber Install the gaskets prope...

Page 6: ......

Reviews: