Solar Energy Systems 01.09.2009
Page
34
Mounting Directions for In-Roof Photovoltaic Systems
Ernst Schweizer AG, Metallbau, CH-8908 Hedingen, T41 44 763 61 11, T41 44 763 61 19, www.schweizer-metallbau.ch
Image 4-19: Flashing ridge/right
3. Fit the flashings into the last row of mounting clamps:
-
Fasten flashing ridge/left above the uppermost left module. Make sure that the flashing overlaps flashing
side/top/left.
-
Fasten flashing ridge/right above the uppermost right module. Make sure that the flashing overlaps flashing
side/top/right.
-
Fasten flashing ridge/middle above the center modules.
Image 4-20: Flashing ridge/middle