2.16
SEL-749M Relay
Instruction Manual
Date Code 20080918
Installation
AC/DC Control Connection Diagrams
Across the
Line Starting
Figure 2.11
AC Connections With Core-Balance CT
The implementation in
requires the following settings:
OUT103FS =
Y
OUT103 =
TRIP
OUT101 =
SALARM OR HALARM
Figure 2.12
Control Connections for Failsafe Tripping
SEL-749M
CBT
CBT core-balance current transformer
The current transformers and the SEL-749M
chassis must be grounded in the relay cabinet.
A
B
C
IN
IC
IB
IA
M
3 ~
Z08
Z07
Z06
Z05
Z04
Z03
Z02
Z01
Contactor
Indicator (contactor closed)
Indicator (relay alarm)
CR
I1
I2
CR
STOP
START
I1
OUT103
SEL-749M
OUT101
(ALARM)
+/H
—/N
PS
A07
A01
A03
A08
CR
A09
A02
A04
I2
Summary of Contents for SEL-749M
Page 6: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 14: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 20: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 32: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 52: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 118: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 188: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 216: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 224: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 274: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 286: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 306: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 310: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...
Page 314: ...This page intentionally left blank Courtesy of NationalSwitchgear com ...