Maintenance and care
34
01.00 | KRP3, KRP3-LH | TANDEM Clamping Block | en | 1514176
Adjustment of pneumatic jaw end position monitoring
Size 100
Jaw 1: monitoring open jaw position
• Move base jaws to OPEN position.
• Screw the set-screw (61) into the bore hole
oo
up to the stop
and then unscrew it again by a few turns.
• Slowly screw the set-screw (61) into the bore hole
o
until the
differential pressure sensor emits a switching signal.
• Hand-tighten the set-screw (61) in the bore hole
oo
.
• Screw set-screw (63) in both bore holes and hand-tighten.
Jaw 2: monitoring closed jaw position
• Move base jaws to CLOSED position.
• Screw the set-screw (61) into the bore hole
ooo
up to the stop
and then unscrew it again by a few turns.
• Slowly screw the set-screw (61) into the bore hole
oooo
until
the differential pressure sensor emits a switching signal.
• Hand-tighten the set-screw (61) in the bore hole
ooo
.
• Screw set-screw (63) in both bore holes and hand-tighten.
Size 160, 200 and 250
Jaw 1: monitoring open jaw position
• Move base jaws to OPEN position.
• Screw the set-screw (61) into the bore hole
o
up to the stop and
then unscrew it again by a few turns.
• Slowly screw the set-screw (61) into the bore hole
oo
until the
differential pressure sensor emits a switching signal.
• Hand-tighten the set-screw (61) in the bore hole
o
.
• Screw set-screw (63) in both bore holes and hand-tighten.