13
www.racing-cars.com
TM
BAG C - Step 23
BAG C - Step 22 Cont.
B
x2
No4 x 1/2”
Pan Hd Screw
C
x2
M3 x 10
Pan Hd Screw
A
x4
No4x 3/8” Pan Hd Screw
!
C
C
B
A
A
A
!
!
Tighten the four nuts AFTER the
required front belt tension has
been acheived.
!
FRONT BELT ADJUSTMENT.
Tighten the screws (turn clockwise)
to tighten the belt tension. To relax
the tension turn anti-clockwise.
!
Check tension by lightly
pushing the belt with an
allen key as shown. Aim
for a belt deflection of
around 5mm.
Note orientation
of block.
Remove temporary screw
and fully tighten here.
Summary of Contents for ProCat Classic
Page 36: ......