OPERATION
RDX-117 06/20
Operation Section 4-18
© 2020 Alamo Group Inc.
O
PE
R
AT
IO
N
Tractor PRE-OPERATION Inspection
Tractor ID#_______________________
Make ___________________________
Date: ___________________________ Shift______________________________
Before conducting the inspection, make sure the tractor engine is off, all rotation
has stopped and the tractor is in park with the parking brake engaged. Make sure
the implement is resting on the ground or securely blocked up and all hydraulic
pressure has been relieved.
Operator’s Signature:__________________________________________________________________
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The flashing lights function properly (tractor & implement)
The SMV Sign is clean and visible (tractor & implement)
The tires are in good condition with proper pressure
The wheel lug bolts are tight
The tractor brakes are in good condition
The steering linkage is in good condition
There are no visible oil leaks
The hydraulic controls function properly
The ROPS or ROPS Cab is in good condition
The seatbelt is in place and in good condition
The 3-point hitch is in good condition
The drawbar pins are securely in place
The PTO master shield is in place
The engine oil level is full
The brake fluid level is full, if applicable
The power steering fluid level is full, if applicable
The fuel level is adequate
The engine coolant fluid level is full
The radiator is free of debris
The air filter is in good condition
Proper hourly greasing is done as per Operator’s Manual
DO NOT OPERATE an UNSAFE TRACTOR or IMPLEMENT
Summary of Contents for RDX-117
Page 4: ......
Page 7: ...Safety Section 1 1 2020 Alamo Group Inc SAFETY SECTION ...
Page 22: ...SAFETY RDX 117 06 20 Safety Section 1 16 2020 Alamo Group Inc SAFETY Decal Location ...
Page 24: ...SAFETY RDX 117 06 20 Safety Section 1 18 2020 Alamo Group Inc SAFETY Decal Description ...
Page 25: ...SAFETY RDX 117 06 20 Safety Section 1 19 2020 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY RDX 117 06 20 Safety Section 1 20 2020 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY RDX 117 06 20 Safety Section 1 21 2020 Alamo Group Inc SAFETY ...
Page 28: ...SAFETY RDX 117 06 20 Safety Section 1 22 2020 Alamo Group Inc SAFETY ...
Page 29: ...SAFETY RDX 117 06 20 Safety Section 1 23 2020 Alamo Group Inc SAFETY ...
Page 30: ...SAFETY RDX 117 06 20 Safety Section 1 24 2020 Alamo Group Inc SAFETY ...
Page 32: ......
Page 33: ...Introduction Section 2 1 2020 Alamo Group Inc INTRODUCTION SECTION ...
Page 38: ......
Page 39: ...Assembly Section 3 1 2020 Alamo Group Inc ASSEMBLY SECTION ...
Page 42: ...ASSEMBLY RDX 117 06 20 Assembly Section 3 4 2020 Alamo Group Inc ASSEMBLY ...
Page 43: ...Operation Section 4 1 2020 Alamo Group Inc OPERATION SECTION ...
Page 84: ......
Page 85: ...Maintenance Section 5 1 2020 Alamo Group Inc MAINTENANCE SECTION ...
Page 86: ...MAINTENANCE RDX 117 06 20 Maintenance Section 5 2 2020 Alamo Group Inc MAINTENANCE Gearboxes ...
Page 93: ......
Page 94: ...RDX 117 06 20 P N B118 010C Printed in Canada ...