VXS/VME64x Tower System
Installation
10836-060
www.schroff.biz
13
R1.1, May 04, 2009
3.2 Basic Functional Check
Before starting the system with VXS/VME boards the following tests have to be
done:
•
Ensure that the unit does not get damaged during transport.
•
Check the Protective Earth (PE) resistance, should be < 0,1 Ohm.
•
Switch on the system and check all VME voltages on the Backplane
connectors before you plug in the VME boards.
•
Plug in the VXS/VME boards.
•
Cover all open Slots with filler panels.
•
Tighten the rear panel mounting screws.
•
Power-on the system and determine the actual current consumption.
•
Replace the mains fuses suitable to the actual current.
Warning!
Voltages over 60 VDC can be present in this equipment. This equipment is
intended to be accessed, to be installed and maintained by qualified and
trained service personnel only.
This equipment is designed in accordance with protection class 1!
It must therefore be operated only with protective GND/earth connection!
The fuse value has been determined in factory for the maximum power
delivered by the power supply. The fuse value must be adjusted to the actual
current consumption of the completed system.
Maximum value is 8 A slow blow.
Summary of Contents for 10836-060
Page 1: ...VXS VME64x Tower System User s Manual Product No 10836 060 May 04 2009 Doc No 63972 161_R1 1...
Page 4: ...VXS VME64x Tower System 10836 060 www schroff biz II R1 1 May 04 2009...
Page 22: ...VXS VME64x Tower System Dimensions 10836 060 www schroff biz 18 R1 1 May 04 2009...
Page 23: ......