7.6.7. Turn the abrasive cutoff valve/switch (#62) to the “OFF” position. See Figure 5.3.
7.6.8. For initial startup the Thompson® Valve (#14) should only be partially open. Turn the
valve knob clockwise to completely close, then turn counterclockwise about four turns
to partially open. The best setting for the valve varies depending on abrasive type, blast
pressure, and nozzle size; therefore, it may take more than one adjustment to achieve the
desired air/abrasive mixture. Further adjustment can be made later as needed.
7.6.9. Close the blowdown ball valve (#4). The ball valve is closed when the handle is
perpendicular to the body (See Figure 7.1).
7.6.10. Slowly open the inlet ball valve (#3). This will pressurize the abrasive blaster and
supply air to the controls.
7.6.11. Slightly open the ball valve (#8) on bottom of the moisture trap (#7) to permit moisture
to continually drain during the blast operation. Once each day completely open the drain
valve to blow out all moisture and dirt particles.
7.6.12. Check the closure, manway, hoses, and piping for leaks while the blaster is pressurized.
Periodically check for leaks thereafter.
7.6.13. The following steps are for setting the water flow and wetting the blast hose (#10). The
water differential pressure gauge (#51) setting can only be seen while blasting, so it is
easier to perform this adjustment with two people.
Wet blasting greatly reduces air borne dust but the use of a respirator is still required
during blast operation.
All operators and personnel in the vicinity must wear OSHA
approved respiratory protection during the operation of this equipment See Sections 3.9,
3.10, and OSHA 29 CFR 1910.134
7.6.14. With one hand grip the blast hose assembly (#10) and with the other hand press in the
deadman safety button.
To begin blasting, aim the blast nozzle (#11) at the object to be
blasted, then firmly press down the deadman lever (#12). Air will flow into the blast
hose and out of the blast nozzle (#11).
Do Not aim the blast nozzle towards yourself or any person. A system malfunction or a
blocked blast nozzle that clears can trigger accidental start up resulting in injury to
personnel.
7.6.15. Turn the blast air pressure regulator knob (#44) to set the blast pressure gauge (#49) to
the desired blasting pressure. See Section 5.17 for procedure.
7.6.16. Adjust the water differential pressure regulator (#50) until the desired water flow is
achieved. See Section 5.21 for procedure. It could take approximately 10-15 seconds for
the blast hose (#10) to become wetted and for water to reach the blast nozzle (#11). This
delay only happens when starting with a dry blast hose (#10). Once the blast hose (#10)
has been wetted, the water will reach the blast nozzle (#11) instantly on subsequent
start-ups. Release the deadman lever (#12) to stop blasting.
7.6.17. Turn the abrasive cutoff valve or switch (#62) to the “ON” position. See Figure 5.3.
7.6.18. The following steps are for abrasive flow setting which may require several adjustments
and testing of the blast flow. It is recommended that testing of the blast be made on a
test piece so not to damage anything of value.
Summary of Contents for AmphiBlast 120
Page 20: ...20 Copyright 2019 Axxiom Manufacturing Inc 2 6 b Bulk AmphiBlast Dimensional Specifications ...
Page 21: ...21 Copyright 2019 Axxiom Manufacturing Inc 2 7 Bulk AmphiBlast Strapping Packing Detail ...
Page 66: ...66 Copyright 2019 Axxiom Manufacturing Inc This page was intentionally left blank ...
Page 71: ...71 Copyright 2019 Axxiom Manufacturing Inc 9 1 d Bulk AmphiBlast Water Panel Back View ...
Page 78: ...78 Copyright 2019 Axxiom Manufacturing Inc 9 2 d Bulk AmphiBlast Water Panel Back View ...
Page 82: ...82 Copyright 2019 Axxiom Manufacturing Inc 9 3 a Vessel and Trailer Assembly ...
Page 83: ...83 Copyright 2019 Axxiom Manufacturing Inc 9 3 b Vessel and Trailer Parts List ...
Page 84: ...84 Copyright 2019 Axxiom Manufacturing Inc 9 4 Thompson Valve II with Diverter Plate ...
Page 85: ...85 Copyright 2019 Axxiom Manufacturing Inc 9 5 Automatic Air Valve normally closed ...
Page 86: ...86 Copyright 2019 Axxiom Manufacturing Inc 9 6 Control Valves Pneumatic and Electric ...
Page 87: ...87 Copyright 2019 Axxiom Manufacturing Inc 9 7 Water Control Valve ...
Page 88: ...88 Copyright 2019 Axxiom Manufacturing Inc 9 8 a G2 Pneumatic Deadman ...
Page 89: ...89 Copyright 2019 Axxiom Manufacturing Inc 9 8 b Deadman Valves Pneumatic ...
Page 91: ...91 Copyright 2019 Axxiom Manufacturing Inc 9 10 AmphiBlast Injection Module ...
Page 92: ...92 Copyright 2019 Axxiom Manufacturing Inc 9 11 Vacuum Loading System ...
Page 93: ...93 Copyright 2019 Axxiom Manufacturing Inc 9 12 Palm Detent Control Valve ...
Page 94: ...94 Copyright 2019 Axxiom Manufacturing Inc 9 13 Halok Assembly ...
Page 96: ...96 Copyright 2019 Axxiom Manufacturing Inc This page was intentionally left blank ...
Page 111: ...111 Copyright 2019 Axxiom Manufacturing Inc 14 0 Water Pump Manual ...
Page 112: ...112 Copyright 2019 Axxiom Manufacturing Inc ...
Page 113: ...113 Copyright 2019 Axxiom Manufacturing Inc ...
Page 114: ...114 Copyright 2019 Axxiom Manufacturing Inc ...
Page 115: ...115 Copyright 2019 Axxiom Manufacturing Inc ...
Page 116: ...116 Copyright 2019 Axxiom Manufacturing Inc ...