Bin Trailer
T. G. Schmeiser Co., Inc.
Ph. (559) 268-8128
Fax (559) 268-3279
16
Initial Setup Checklist
Efficient and safe operation of the implement requires
that every user read and understand the operational
instructions and all related safety instructions outlined in
this manual.
This checklist is provided for the user/owner. It is
important for both personal safety and to maintain the
mechanical condition of the implement that this checklist
is followed.
1. Raise the jack stand until the tongue is at the height
of the pulling vehicle drawbar.
2. Connect the hitch of the unit to the pulling vehicle.
3. Raise the jack stand and rotate into its storage
position.
Attaching to Pulling Vehicle
ASSEMBLY AND OPERATION
WARNING
Understand Safety Procedures!
Read and understand all safety procedures
described in this manual before performing any work
on or around the implement.
Operating Instructions
1. Make sure the Bin Trailer is properly attached to the
pulling vehicle before beginning work. Inspect the
condition of the rollers and the overall Bin Trailer for
potential problems or damage. Do not use the unit if
it needs repairs of any type.
2. Clear the area of bystanders, especially small
children. Make sure that you can clearly see and
identify passersby, steep slopes, ditches, drop-offs,
power lines, debris, and foreign objects. If you are
unable to clearly see these type of items, discontinue
operating the Bin Trailer.
3. Know the location of all underground cables,
pipelines, and other hazards in the area. Also make
certain that all irrigation heads, utility outlets, and
other obstacles are properly marked.
4. Watch for low hanging limbs, power lines, and other
overhead obstacles while you are operating. Use
care to avoid hitting these items.
5. Do not operate the Bin Trailer or drive the pulling
vehicle into material that is burning, or areas that
recently burnt and may contain hot spots. Tire
damage can occur when driving over hot material.
Oil and grease on the pulling vehicle and the trailer
could ignite resulting in equipment destruction.
Implement Break-In
Although there are no operational restrictions on the Bin
Trailer when used for the first time, it is recommended
that the following mechanical items be checked:
1. After 1/2 hour of operation check all fasteners and
tighten if necessary.
2. After 10 hours of operation go to the normal servicing
and maintenance schedule, as defined in the
Maintenance Section.
Make sure the Bin Trailer is
properly attached to the pulling
vehicle.
Refer to “Attaching to Pulling
Vehicle” on page 16.
Make sure all hardware is
properly installed and tightened.
Refer to “Maintenance” on page
19.
Lubricate grease fittings.
Refer to “Lubrication Points” on
page 19.
Location Task
Initial Setup Checklist
(prior to using for the first time)