Safety Regulations

Please comply with safety standard DIN EN 

1012-2 for vacuum pumps.

Alterations to the side channel compressors may 

be effected only after agreement by the factory.

The mains-powered VariAir Con-

verter uses dangerous voltages. 

The converter must be isolated 

from the mains when any work is 

being carried out on it. Disregarding the regula-

tions can result in property damage or serious 

or fatal injuries. The capacitors can contain 

dangerous voltages for some time after the 

mains is switched off. A 5-minute discharge time 

is therefore to be allowed before the terminal 

cabinet is opened.

Air compression will generate high 

temperatures: Install compressors 

in a position where hot surfaces 

cannot be touched. Protect the 

area around them or install warning signs.

Application

Side channel compressors are used for the 

generation of vacuum. 

Their characteristics apply up to a height of 

800 m above sea level. They are unsuitable for 

the transport of toxic,  flammable or aggressive 

media. 

When operating side channel compressors, 

ensure that only normal atmospheric air can be 

taken in. Should dusty media be handled, igni-

tion temperatures of dust/air mixtures generated 

must not be reached. 

Transport and storage

Store side channel compressors in a dry place 

and protect against water splashes. 

Lift and transport by using suitable belts. 

Installation

It is recommended to install the compressor with 

easy access for maintenance. 

 

optimal         optimal         improper

Clearance between compressors and adjacent 

walls should be no less than 10 cm of free space 

in order to ensure sufficient air flow for cooling. 

J.Schmalz GmbH prior to installation under noise 

insulation canopies, contact. 

Ambient temperatures must not exceed 40°C. 

Side channel compressors may be installed 

horizontally on a stand or vertically without a 

stand (with the motor at the top). 

The stand has vibration damping elements in the 

fixing holes (Pos. 204). The mounting screws just 

as firmly, that the foot is not in direct contact with 

the ground (gap ≥ 0.5 mm).

The installation face must be flat to ensure a 

safe level.

Assembly

Ensure correct dimensions of and clean pipelines 

(no weld spatter, chips or similar contamination). 

Ensure that pipelines are no less in diameter than 

connecting threads. Use next larger diameter for 

pipelines exceeding 2 m in length.

Keep connections free from oil, grease, water 

and other contaminants. 

Avoid deviation from maximum pressures by 

installation of safety valves. 

Remove end caps at SA. Do not connect to 

pipeline yet. 

Motor connection

Installation and commissioning of the VariAir 

Converter:

Only qualified persons may install or commission 

this equipment.

Observe the operating instructions for the 

FU Frequency Converter!

Connection of compressors to mains supply must 

comply with applicable regulations. 

Connect Frequency Converter based on con-

necting diagram. This work should be carried 

out by an experienced electrician only. Check 

for connecting voltage and frequency. 

Commissioning

Connect inlet line at SA. Avoid mechanical 

stresses by pipe or casing connection by using 

flexible connectors. 

Blocked inlet filters or excessive pressure dif

-

ferentials will cause unacceptable, excessive 

operating temperatures (remedy: pressure-

reducing valve). 

Avoid exceeding maximum pressure values by 

installing safety valves.

Should vacuum safety valves be retrofitted, set 

to maximum operating pressure as stated on the 

rating plate during initial operation. Any safety 

valves installed in the factory will be preset. 

Maintenance

Regular maintenance of your compressor will 

yield the best results. Maintenance intervals will 

depend on use and operating conditions. 

Before carrying out any mainte-

nance, disconnect motor from 

mains and reliably prevent unin-

tentional restarting. 

Clean fan hood and compressor surfaces to 

prevent overheating. 

SA

FU

Summary of Contents for SB FU Series

Page 1: ...ten Die Montage des Seitenkanalverdichters kann horizontal mit einem Gerätefuß oder vertikal ohne Gerätefuß Motor oben erfolgen Der Gerätefuß hat in den Befestigungslöchern schwingungsdämpfende Elemente Pos 204 Die Befestigungsschrauben nur so fest anzie hen dass der Fuß mit dem Untergrund nicht in direktem Kontakt kommt Spalt 0 5mm Die Auflagefläche muss eben sein um einen sicheren Stand zu gewäh...

Page 2: ...pies contact Ambient temperatures must not exceed 40 C Side channel compressors may be installed horizontally on a stand or vertically without a stand with the motor at the top Thestandhasvibrationdampingelementsinthe fixingholes Pos 204 Themountingscrewsjust as firmly that the foot is not in direct contact with the ground gap 0 5 mm The installation face must be flat to ensure a safe level Assemb...

Page 3: ...empérature ambiante ne doit pas dépasser 40 C On peut monter le compresseur horizontale ment avec un pied ou verticalement sans pied moteur en haut Au niveau des alésages de fixation le pied de la machine est équipé d éléments amortisseurs de vibrations pos 204 Serrerlesvisdefixationde manière à ce que le pied n entre pas en contact direct avec le sol écart 0 5 mm Lasurfaced appuidoitêtreaussipour...

Page 4: ...o Handleiding Instrucciones para el manejo Manual de instruções Naudojimosi instrukcija Kasutusjuhend Lietošanas instrukcija Οδηγίες χρήσης 取扱説明書 사용설명서 Driftsinstruks Driftsinstruktioner Käyttöohje Driftsvejledning Instrukcja obsługi Kezelési útmutató Návod k obsluze Navodilo za uporabo Návod na obsluhu El Kitabi Инструкция по эксплуатации 使用说明书 A 100mm A 4 20 C 4 F 40 C 104 F max 800m max 90 A A ...

Page 5: ...hmalz Blower SB FU Seite Page 5 5 p VACUUM Ø 60mm L1L2L3 0 2 5mm 3 PE 2 1 2Nm 3 L1 L3 L2 i L1 L2 L3 L1 L2 L3 M 3 3 3 U V W Circuit breaker FU C 16 i Ser Nr Input V Hz Output 3 Hz IP 10 11 12 2 3 Min OFF O 0 OFF I O n 0min 1 www becker international com AJ www schmalz com i J Schmalz GmbH Johannes Schmalz Str 1 D 72293 Glatten schmalz schmalz de SERVICE www schmalz com Sales and service network A B...

Reviews: