OPERATOR‘S MANUAL
9
NT2 rondo
Version: 27211 -
F
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
4.2
Installation Preparations / Concrete pool
Tailor the installation kit:
Place the installation kit on the formwork board and transfer the bore holes. Bore the holes
into the pool-side formwork board (P
b
).
Screw the installation kit complete with the mounting protection film (C) tightly to the pool-
side formwork board (P
b
).
After removing the shuttering take off the polystyrene filling piece (A). Also remove the pro-
tection film (C).
4.3
Installation Preparations / Pre-fabricated pool
fig. 9
fig. 10
A
Polystyrene filling piece
C
Mounting protection film
P
Pool-side formwork board
20
Installation kit
fig. 11: Boring diagram
Tailor the installation kit:
Apply the cavity
Ø
205
and the mounting
holes
Ø
9
to the pool wall.
Warning! Risk of damage!
The hold-ring (Item 62) must be used as
a template.
For backfilling the pool ensure that there
is a cavity at least the size of the dotted
lines.
600
250
ca.105
BWSP
20
C
P
8306
8307
8308