29
/
33
6.2. Module mounting and clamping in the case of horizontal module bearing
The horizontal module clamping is carried out with a module clamp adapter in combination with Rapid 2+ clamps or
Standard clamps:
Insert the module clamp into the
rail of the module clamp adapter
Push the module towards the
clamp (observe the clearance!)
Fasten hex socket screw with a
torque of 15 Nm
15 Nm
Fig. 6.2.-1 (clicking in the module clamp)
Fig. 6.2.-2 (pushing/sliding the module towards the clamp)
Fig. 6.2.-3 (fastening the hex socket screw)
1.
2.
3.
1.
2.
3.
Schletter Solar GmbH – Alustraße 1 – 83527 Kirchdorf
Mounting instruction
FS UNO
with SRF Foundation Posts
| 20
16
.0
9
V.00
4