Install the last module.
•
Tighten the middle clamps (at the bottom and at the top) between the
modules with Screws M8 (T40)
•
Mount and tighten the end clamps on the free side of the module.
•
Connect the module cable according to the plan.
Insert the end clamps at least 10 mm from the rail end
Note the module spacing for middle clamps
There are basically 3 ballasting options:
•
Ballasting with 100-mm-wide concrete blocks on the base rails (see Detail A)
•
Ballasting with additional trough (see Detail B)
•
Ballasting with additional ballast shafts (see Detail C)
•
Ballasting from the combination of the 3 possibilities
The information about ballasting can be obtained
with the planning of your solar plant from the Schletter
configurator.
Use fixing flaps to attach the parts of the surface protection mat to the additional
trough.
(Ballast is not included in the scope of delivery).
9
10
MOUNT THE LAST
MODULE OF THE ROW
OBSTRUCT THE BALLAST
1-2 mm
1-2 mm
2
F
ix
Grid
18-100
| V
2
|
MO
UNTING INSTRUCTIONS
| 20
18
11
S C H L E T T E R S O L A R G M B H | S U B J E C T T O M O D I F I C A T I O N S
8