![Schletter FixGrid18-100 Mounting Instructions Download Page 2](http://html1.mh-extra.com/html/schletter/fixgrid18-100/fixgrid18-100_mounting-instructions_1212726002.webp)
FixGrid100-18
Mounting instructions for double
alignment (e.g., East-West):
Required tool
Further required documents
Tightening torques
Safety information
Variant 13°:
Variant 6°:
Measuring tape, screwdriver with Bit TX drive T40 (module mounting) and socket
wrench insert with SW8 socket wrench (e.g., internal connector)
General mounting instructions - Mounting and project planning
Mounting instructions Module clamps Rapid 16
Product Sheet FixGrid18, FixGrid18 Kit
Screw connections M8: 15 Nm
Exception: Self-drilling screws have to be screwed on in a stop-oriented manner
The system is to be installed only with ballasting in accordance with static loads.
You will receive these with the planning of your solar plant from the Schletter
configurator
Risk of breakage! PV modules can be damaged if they are stepped on.
Planning of the solar power system, installation and commissioning may only be
performed by qualified personnel. Improper execution can cause damage to the
system and endanger people.
Danger due to electric current! Installation and maintenance of the PV modules
may only be performed by qualified personnel. Observe the safety regulations of
the PV module manufacturer!
Risk of falling! There is a risk of falling when working on the roof and when
climbing up and down. Is it imperative that the accident prevention regulations
are observed and that suitable fall protection devices are used.
PV mounting
systems are not suitable as climbing aids or fall protection.
F
ix
Grid
18-100
| V
2
|
MO
UNTING INSTRUCTIONS
| 20
18
11
S C H L E T T E R S O L A R G M B H | S U B J E C T T O M O D I F I C A T I O N S
2