Schletter FixGrid18-100 Mounting Instructions Download Page 2

FixGrid100-18

Mounting instructions for double 
alignment (e.g., East-West):

Required tool

Further required documents 

Tightening torques

Safety information

Variant 13°:

Variant 6°:

Measuring tape, screwdriver with Bit TX drive T40 (module mounting) and socket 
wrench insert with SW8 socket wrench (e.g., internal connector)

General mounting instructions - Mounting and project planning
Mounting instructions Module clamps Rapid 16 
Product Sheet FixGrid18, FixGrid18 Kit

Screw connections M8: 15 Nm
Exception: Self-drilling screws have to be screwed on in a stop-oriented manner

The system is to be installed only with ballasting in accordance with static loads. 
You will receive these with the planning of your solar plant from the Schletter 

configurator

Risk of breakage! PV modules can be damaged if they are stepped on.

 

Planning of the solar power system, installation and commissioning may only be 
performed by qualified personnel. Improper execution can cause damage to the 
system and endanger people.

Danger due to electric current! Installation and maintenance of the PV modules 
may only be performed by qualified personnel. Observe the safety regulations of 
the PV module manufacturer!

Risk of falling! There is a risk of falling when working on the roof and when 
climbing up and down. Is it imperative that the accident prevention regulations 
are observed and that suitable fall protection devices are used.

 PV mounting 

systems are not suitable as climbing aids or fall protection.

F

ix

Grid

18-100

 |  V

2

  |  

MO

UNTING INSTRUCTIONS

  |  20

18

11 

S C H L E T T E R   S O L A R   G M B H     |     S U B J E C T   T O   M O D I F I C A T I O N S

 

2

Summary of Contents for FixGrid18-100

Page 1: ...FixGrid18 100 MOUNTING INSTRUCTIONS...

Page 2: ...ning of your solar plant from the Schletter configurator Risk of breakage PV modules can be damaged if they are stepped on Planning of the solar power system installation and commissioning may only be...

Page 3: ...cific rules and regulations have to be observed Roof cleaning In order to ensure that the base rails are supported across their entire surface impurities such as moss leaves dirt stones etc have to be...

Page 4: ...n mounting frames with the module supports Defining the base rail lengths and distances between module supports maintenance walk way width Distance a has to be adapted according to the width of the ma...

Page 5: ...s Take into account a projection of the surface protection mat of at least 30 mm at the rail ends In the case of transversely flowing rainwater the distance has to be dimensioned on the basis of the a...

Page 6: ...ansversely draining roof water The permissible surface pressure of the roof has to be checked Sufficient drainage of rainwater has to be ensured Align base rails parallel to each other align the FixZ...

Page 7: ...to the alignment of the module row Apply the Rapid 16 end clamps at the top and at the bottom to the module and tighten Screws M8 T40 Place the module center clamp on the module do not tighten Connect...

Page 8: ...the base rails see Detail A Ballasting with additional trough see Detail B Ballasting with additional ballast shafts see Detail C Ballasting from the combination of the 3 possibilities The informatio...

Page 9: ...are turned 180 degrees recesses on the left from right to left The tray always lies with the side of the slots at the bottom and in the base rail with a positive fit At the last ballast tray the end h...

Page 10: ...0 0 SCHLETTER SOLAR GMBH Alustrasse 1 83527 Kirchdorf GERMANY www schletter group com We reserve the right to changes including technical modification 10...

Reviews: