Ensure that the flat roof waterproofing is c ompatible with the mounting sy ste m . T h e roof
drainage sy stem has to be included in the planning of your solar plant.

In the case of very uneven roofs or roof waterproofing, c ompensatory measure s m ay have to be taken in 
order to ensure a uniform introduction of the load.

N e cessary distance s to roof e d g e s have to be maintained.
T h e maximum field size depends on the type of roof.
For foil roofs, it is max. 10 m ; for c oncrete roofs, it can also be larger in individual cases.

In the case of roofs with substrate or gravel roofing, it has to be ensured that a sufficiently non-slip
c onnection o ccurs.

Please check the existing pitch of the roof and whether the mounting sy stem has to be secured against
slipping.

T h e surface load is not permitted to exc eed the residual load-bearing capacity of the building!

T h e partial surface pressure, which acts on the roof m e m brane and insulation under the base rails, is not
allowed under any circumstance s to exc eed the maximum permissible surface pressure.
Current c ountry-specific rules and regulations have to be observed.
Roof cleaning! In order to ensure that the base rails are supported acro s s their entire surface, impurities
such as m o s s , leaves, dirt, stones, etc . have to be re m oved.

If there is a lightning protection sy stem involved, it is important to determine the extent to which
integration by a c ertified lightning protection co mpany is necessary. W h ether or not the lightning
protection requirements change as a result of the installation also has to be determined.

D u e to static reasons, the installation of a single module row is not permitted!

P rior to installation, the roof has to be checked for damage of any kind, particularly water beading
or damage to the roof m em b rane. These should be documented with photo s in order to be able to
c ounteract any re course claims. T h e sy stem has been developed for modules with a width of 950-1050
m m (standard module dimensions according to the current status). Other module dimensions on request
and separate verification. Information about module clamping pursuant to the manufacturer has to be
observed.

T h e FixGrid18 mounting sy stem is fixed to the roof purely with ballast (exc ept special cases). A detailed
ballast calculation can be found in the project-related planning documents. T h e ballasting is calculated
in such a way that sliding, tilting and lifting of the rack is avoided.

Use only original Schletter c omponents!

N o modifications to the modules are required to secure them. It is the

client’s/installer’s

responsibility  to ensure  the clamp  location  is in  accordance with the  panel  installation 
manual.

All other markings, information on the number of modules and
additional information can be found in the project-specific
documents.

U s e the current mounting instructions! A c c essible on our website:

www.schletter-group.c om

in the FixGrid18  section.

FIXGRID EAST-WEST   I   V1  I   INSTALLATION MANUAL   I   

12-2020 SCHLETTER NA Inc.  I  SUBJECT TO CHANGE 

WITHOUT NOTICE

3

Summary of Contents for FixGrid East-West

Page 1: ...F i x G r i d E a s t W e s t short side clamping F i x G r i d E a s t W e s t long side clamping INSTALLATION MANUAL...

Page 2: ...med by qualified personnel Observe the safety regulations of the PV module manufacturer Risk of falling There is a risk of falling when working on the roof and when climbing up and down Is it imperati...

Page 3: ...ified lightning protection company is necessary Whether or not the lightning protection requirements change as a result of the installation also has to be determined Due to static reasons the installa...

Page 4: ...base rail length can be selected from the six standard lengths 2150 2650 3150 4200 6000 6300 mm and combined with each other The base rails can be connected with the internal connector Item No 129078...

Page 5: ...s The base rail length can be selected from the six standard lengths 2150 2650 3150 4200 6000 6300 mm and combined with each other The base rails can be connected with the internal connector Item No 1...

Page 6: ...r the distance has to be dimensioned on the basis of the amount of precipitation on site The installation distances of the surface protection mats below the base rail result from the chosen installati...

Page 7: ...e of 100 mm Load introduction on large area for high loads and or soft subsoil with low permissible surface pressure Also suitable for transversely draining roof water The permissible surface pressure...

Page 8: ...odule do not tighten Connect the module cable according to the plan 6 APPLY THE FIRST MODULE Click Rapid 16 end clamps into place at the edge of the module field and position them Also click the Rapid...

Page 9: ...Ballasting with 100 mm wide concrete blocks on the base rails see Detail A Ballasting with additional trough see Detail B Ballasting with additional ballast shafts see Detail C Ballasting from the co...

Page 10: ...stand on the base rails All other trays are turned 180 degrees recesses on the left from right to left The tray always lies with the side of the slots at the bottom and in the base rail with a positiv...

Page 11: ...E TWO MODULES OF THE EAST WEST CONFIGURATION FIXGRID EAST WEST I V1 I INSTALLATION MANUAL I 12 2020 SCHLETTER NA Inc I SUBJECT TO CHANGE WITHOUT NOTICE 11 BALLAST EXAMPLES FIXGRID 10 PER ONE OF THE TW...

Page 12: ...HE TWO MODULES OF THE EAST WEST CONFIGURATION FIXGRID EAST WEST I V1 I INSTALLATION MANUAL I 12 2020 SCHLETTER NA Inc I SUBJECT TO CHANGE WITHOUT NOTICE 12 BALLAST EXAMPLES FIXGRID 5 PER ONE OF THE TW...

Page 13: ...ER TWO MODULES OF THE EAST WEST CONFIGURATION FIXGRID EAST WEST I V1 I INSTALLATION MANUAL I 12 2020 SCHLETTER NA Inc I SUBJECT TO CHANGE WITHOUT NOTICE 13 BALLAST EXAMPLES FIXGRID 5 PER TWO MODULES O...

Page 14: ...part and continues via the screw the assembly claw the module suport and the turn in connector to the basic profile The external bonding path must be specified by the Installer COMPONENTS RECOMMENDED...

Page 15: ...onal Electrical Code including NEC 250 Grounding and Bonding and NEC 690 Solar Photovoltaic Systems and Installation shall be in accordance with CSA C22 1 Safety Standard for Electrical Installations...

Page 16: ...eral amount of conductor compound in wireway of ground lug 5 Install ground conductor in lug and torque wire screw to the following 6 AWG 35 in lbs 8 AWG 25 in lbs 10 14 AWG 20 in lbs Flat washer and...

Page 17: ...t a PV module complying with UL 1703 only when the specific module has been evaluated for grounding and or mounting in compliance with the included instructions O vercurrent Protection Device groundin...

Page 18: ...rking properly WARNING The PV System must be shut down first if it needs any electrical maintenance Improper maintenance may cause lethal electric shocks or burns Fire Test FixGrid racking system meet...

Page 19: ...00 kPa RAPID 16 shear strength kN clamp INFORMATION O N TENSILE OR SHEAR STRENGT H Rapid 16 module clamps according Z 14 4 631 available in 50 or 100mm lengths SHEAR Load direction TENSILE Profile FT...

Page 20: ...W MB AG CS3W CS3U PB AG CS3U P CS3U MS CS3U MB AG CS3U CS3L P CS3L MS CS3L CS3K PB AG CS3K P CS3K MS CS3K MB AG CS3K CS1Y MS CS1U MS CS1K MS CS1H MS ET M660 290 285 280 275 270 WW WB ET M672 340 335 3...

Page 21: ...3 Q PEAK DUO L G6 Q PEAK DUO L G6 1 Q PEAK DUO L G6 2 Q PEAK DUO L G6 3 Q PEAK DUO L G6 4 Q PEAK DUO L G6 5 Q PEAK DUO L G6 6 Q PEAK DUO L G6 7 Q PEAK DUO L G7 Q PEAK DUO L G7 1 Q PEAK DUO L G7 2 Q PE...

Page 22: ...265PP 60 JKM270P 60 V JKM275P 60 JKM275PP 60 V JKM320P 72 V JKM330P 72 JKM330PP 72 V JKM390 395 400 405 410M 72HL V JKMxxxM 60HBL JKMxxxM 72HL TV JKMxxxM 7RL3 TV JKMxxxM 7RL3 V LG LGxxxN1C A5 LGxxxN1C...

Page 23: ...0 290 MONO BLACK 5 busbar Sunmodule Plus SW 280 295 MONO Sunmodule Plus SW 285 300 MONO 5 busbar Sunmodule Pro Series SW 260 POLY WOB Sunmodule Protect SW 275 280 MONO BLACK Sunmodule SW 100 POLY RGP...

Page 24: ...M DE14A TSM DD14A TSM PD05 TSM PD05 05 TSM PD05 08 TSM xxx DD05A 05 II TSM xxx PD05 08 TSM xxx PD05 10 TSM PD14 TSM PE14 TSM PEG14 TSM PEG40 07 TSM PEG5 TSM PEG5 07 TSM DD06M 05 II TSM DE06H TSM DE06M...

Page 25: ...ZXM6 H120 xxx_M ZXM6 H144 xxx_M ZXM6 HLD120 xxx_M ZXM6 HLD144 xxx_M ZXM6 HLDD144 xxx_M ZXM6 LD60 xxx_M ZXM6 LD72 xxx_M ZXM6 LDD72 xxx_M ZXM6 NH120 xxx_M ZXM6 NH144 xxx_M ZXM6 NHLD120 xxx_M ZXM6 NHLD1...

Page 26: ...SCHLETTER NA INC 5200 77 Center Drive Suite 250 Charlotte NC 28217 Phone 1 704 595 4200 Fax 1 704 595 5210 CANADA Phone 1 519 946 3800 rooftopNA schletter group com www schletter group com 26...

Reviews: