3. M O U NT I N G O F T H E SU R FA C E P R O T E C T I O N MAT
•
After re m oving the protective film, glue the cut parts of the surface protection mat onto the base
rails.
•
Take into acc ount a projection of the surface protection mat of at least 30 m m at the rail ends.
•
Marking for the mounting of the module support:
Front edge of the module support = Distance - 28 m m
•
Place the front edge of the support on the mark; pay attention to the direction of rotation!
•
Turn clockwise by 90
°
.
Observe suitable module and row distance s for rail and module mounting.
In the case of transversely flowing rainwater, the distance has to be
dimensioned on the basis of the amount of precipitation on site.
T h e installation distance s of the surface protection mats below the base rail result fro m the chosen
installation variant.
Variant A
•
Mount 20-mm-thick and 300-mm-long strips c entrally under each support
•
L oad introduction on a small area (for low loads and/or solid subsoil)
•
A n additional surface protection mat should be positioned under joints of the base rails!
•
If the roof water drains off transversely, an almost unhindered drainage is possible.
alway s c entered below bearing
FIXGRID EAST-WEST I V1 I INSTALLATION MANUAL I
12-2020 SCHLETTER NA Inc. I SUBJECT TO CHANGE
WITHOUT NOTICE
6
2. M O U NT I N G O F T H E M O D U L E S U P P O R T W I T H P R E -ASSE MBLED SC R E W -IN C O N N E C T O R O N
T H E BA S E R AI L