4
MATAWAY
Do not operate this equipment until you have read
and understand the SAFETY, CONTROLS and
OPERATION sections the operator manual.
To prevent injury, use an adequate lifting device
(i.e., hoist, or fork lift) to remove unit from pallet.
1. Remove the crate top and sides.
Banding is under tension and may snap back
when cut. Wear eye protection and stay clear
when cutting the band.
2. Remove and discard banding attaching the
Mataway to the pallet, Remove shipping brackets
that hold down front axle and discard. Remove unit
from pallet.
3. Remove the transmission belt cover. Tilt unit
forward and support the chassis with jack stands.
4. Remove the belt shield under frame
G
(Figure 3
).
To prevent fuel spillage and/or the risk of fire
or personal injury from inhalation of fumes, be
sure fuel tank is empty before tilting the unit
forward.
Support rear of tilted unit adequately.
5. Remove Side guards in
Figure 1
.
6. Move the reel clamp levers
E
(Figure 1) (left and
right side) rearward to release the reel clamps.
7. Position the reel with the pulley toward the right side
of the machine. Slip the 3 belts around the pulley
F
(Figure 2).
8. Position the pillow block in the recessed part of the
frame on each side so the pillow block groove fits
over the frame.
9. Hook the retaining clamp rods into the holes in
the reel clamps, then rotate the levers forward
until they lock over the center to secure the reel.
If necessary, the over center tension can be
adjusted with the turnbuckles on the reel clamp rod
assemblies.
A loose reel may cause injury or property
damage. Be certain the reel clamp lever locks
SET-UP
over center to keep the reel from working loose.
10. Reinstall belt sheild and LH and RH side guards.
11. Install the belt shield
G
under the frame and secure
it with (1) 5/16-18 X 3/4 screw and lockwasher.
12. Remove jack stands and set unit on the ground.
13. For final adjustment of the reel, refer to the
Adjustment section of this manual.
Check the engine oil level. Top off if necessary.
See the adjustment section for setting blade height.
14. Add weight to front of unit.
FIGURE 1
FIGURE 2
FIGURE 3
Summary of Contents for RYAN MATAWAY 744283C
Page 19: ...17 MATAWAY PARTS SECTION PARTS SECTION ...
Page 30: ...28 MATAWAY FIGURE 6 GUARDS ...
Page 32: ...30 MATAWAY FIGURE 7 REEL 1 32 BLADES 1 2 SPACING 1 2 2 3 3 4 5 6 7 8 9 10 12 13 14 15 16 ...
Page 34: ...32 MATAWAY FIGURE 8 REEL 1 32 BLADES 1 SPACING 1 2 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 ...
Page 36: ...34 MATAWAY FIGURE 9 REEL 1 16 BLADES 1 SPACING 1 2 2 3 3 4 5 6 7 8 9 10 12 13 14 15 16 ...
Page 38: ...36 MATAWAY FIGURE 10 REEL 1 16 BLADES 1 2 SPACING 1 2 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 17 ...