Installation, Mounting and Maintenance DISA-H

Z11/31 - 5

Construction subject to change.

No return possible!

18.02.2013

Version:

Installation and commissioning

Operating conditions

Prior to installation or commissioning of the device, the follow-

ing operating conditions must be observed:

Material reception 

Upon reception of the materials, the components must be care-

fully checked, in order to guarantee that no transport damage

has taken place. Moreover, the dimensions, composition and

number of the identification sticker must be checked as to

whether they are as ordered.

Identification sticker:

To prevent possible damage during transport, the devices will

be delivered ex works on pallets (that correspond to the partic-

ular weight and dimensions) wrapped with tapes and transpar-

ent plastic film. It is recommended leaving this protection in

place until the device is commissioned. The openings of the

pipes should be closed with dust caps to avoid dust and entry of

dirt. 

Transport, lifting and handling

Transport and handling of the unit

shall take place in the position in

which the unit is to be built in later

on, unless expressly stated other-

wise on the unit.

Transport, unloading and lifting of

the unit shall take place with the

necessary care and using tools that

are appropriate for the weight and

dimensions.

(1) Standard unit: h heat exchanger (empty)

Storage

If the device is not installed immediately after its reception, it

must be stored according to the following instructions:

- Coolant or heating fluid: water or glycols (ethylene or pro-

pylene) at a concentration below 60%.

- Water inlet temperature: above the dew point up to 80°C

(Please note that some connectors do not work at water

temperatures above 65°C)

- Air inlet temperature: from 2 to 45°C
- Max. operating pressure: 8 bar / 95°C

-

H: 

2-pipe system

-

D: 

Nozzle configuration - D -

-

900: 

Length of the device - 900 mm -

-

H: 

Connection -horizontal-

-

123: 

Diameter of the connection pipes - 123 mm -

-

AS1:

 Number of connection pipes - 1 connection pipe arranged cen-

-

WS1:

 Hydraulic connection - left -

To prevent deposits and corrosion, 

the quality of the water for filling the registers must

comply with regulations VDI 2035 and DIN 50930.

Should manufacture-related damage be detected

on the device,

please contact your local sales office prior to in-

stallation.

Model

900

1200 1500

Weights

 (1) 

(kg) 19

23

28

- The device must be stored at a dry, clean, safe location

where no damage to the device can occur, i.e., outside

corrosive atmospheric influences.

- Leave the protections attached ex works (film, tapes, pal-

lets, etc.) on the device, unless they have already been re-

moved beforehand.

- Cover the device with tarpaulins, in order to protect it from

dust, moisture and extreme temperatures.

- Entries, openings and pipes must be hermetically sealed

with dust caps.

The unit shall only be held in position or moved 

by holding on to the housing. The weight must not

rest on the condensate pan or the water connec-

tions.

SCHAKO cannot be held liable for damage to the

unit caused by improper handling or handling not

mentioned here, loading or unloading.

Summary of Contents for DISA-H Series

Page 1: ...Ferdinand Schad KG Steigstra e 25 27 D 78600 Kolbingen Telefon 49 0 74 63 980 0 Telefax 49 0 74 63 980 200 info schako de www schako de Installation Mounting and Maintenance DISA H...

Page 2: ...ormation 4 Identification of the delivered model 4 Function 4 Installation and commissioning 5 Operating conditions 5 Material reception 5 Transport lifting and handling 5 Storage 5 Installation 6 Mou...

Page 3: ...acement of defec tive materials Recycling The inspection installation hydraulic connection and commissioning of the device must be carried out by qual ified skilled personnel only in compliance with t...

Page 4: ...nsist of copper pipes 12 mm in thickness aluminium ribs diffuser system and a steel frame Grille 3 Louvre grid for supply air and return air optional Hydraulic connections 4 Upon customer request the...

Page 5: ...tion it must be stored according to the following instructions Coolant or heating fluid water or glycols ethylene or pro pylene at a concentration below 60 Water inlet temperature above the dew point...

Page 6: ...As standard the cooling circuit pipes are attached on the outside and the heating circuits at the centre of the register 4 pipe Hydraulic connections DISA H H 2 pipe Hydraulic connections DISA H HT 4...

Page 7: ...rks During in stallation the manufacturer s specifications must be observed Temperature controls The temperature controls are mounted in accordance with the selected model This is why the instructions...

Page 8: ...onnected to the hydraulic cir cuit with flexible hos es of sufficient length Hydraulic connections were tightened properly and exhib it no leaks Connecting and fastening elements have been sufficientl...

Page 9: ...and the following formula can be used to to determine the volumetric flow V l s Primary air flow Ps Pa Static pressure The K value is taken from the following table Air density 1 2 kg m3 VZU m3 h supp...

Page 10: ...r Install thermostat in a different place Clogging of the cooling heating register Clean the register in accordance with the maintenance instructions The unit is losing water Condensate in the registe...

Page 11: ...100 SAFETY OF MACHINERY Safety of Machinery Basic terms general principles of design Part 1 Basic terminology methodology DIN EN ISO 12100 SAFETY OF MACHINERY Safety of Machinery Basic terms general p...

Reviews: