background image

Installation, Mounting and Maintenance DISA-B

Z11/36 - 5

Construction subject to change.

No return possible!

09.05.2014

Version:

Installation and commissioning

Operating conditions

Prior to installation or commissioning of the device, the follow-

ing operating conditions must be observed:

Material reception 

Upon reception of the materials, the components must be care-

fully checked, in order to guarantee that no transport damage

has taken place. Moreover, the dimensions, composition and

number of the identification sticker must be checked as to

whether they are as ordered.

Identification sticker:

To prevent possible damage during transport, the devices will

be delivered ex works on pallets (that correspond to the partic-

ular weight and dimensions) wrapped with tapes and transpar-

ent plastic film. It is recommended leaving this protection in

place until the device is commissioned. The openings of the

pipes should be closed with dust caps to avoid dust and entry of

dirt.

 

Transport, lifting and handling

Transport and handling of the unit

shall take place in the position in

which the unit is to be built in later on,

unless expressly stated otherwise on

the unit.

Transport, unloading and lifting of

the unit shall take place with the nec-

essary care and using tools that are

appropriate for the weight and dimensions.

WeightsDISA-B

(1) 

Standard unit: h slot + grille and heat exchanger (empty)

Storage

If the device is not installed immediately after its reception, it

must be stored according to the following instructions:

- Coolant or heating fluid: water or glycols (ethylene

 or propylene) at a concentration below 60%.

- Water inlet temperature: above the dew point up to 80°C

(Please note that some connectors do not work at water

temperatures above 65°C)

- Air inlet temperature: from 2 to 45°C
- Max. operating pressure: 8 bar / 125°C.

-

HT: 

4-pipe system

-

PA: 

Louvre grid PA -extruded aluminium profile-

-

B:  

Nozzle configuration -B-

-

1000: 

Nominal length -1000 mm-

-

1150: 

Total length -1150 mm-

-

M:

 Position of primary air plenum box -central-

-

WS1: 

Water connection -left-

-

AS1:

 Number of connection pipes -1 connection pipe arranged cen-

-

123:

 Diameter of the connection pipes -123 mm -

To prevent deposits and corrosion, 

the quality of the water for filling the registers must

comply with regulations VDI 2035 and DIN 50930.

For optimum operation in cooling mode, a mini-

mum pressure loss of 90 Pa is recommended for

the primary air.

SCHAKO Iberia, S.L. - Pol. Ind. Río Gállego, C/B, nave 3 - E-50840 San Mateo de Gállego.

Model

 / Modelo / Modell

DISA-B-HT-PA-B-1000-1150-M-WS1-AS1-123

 Order 

nr.

 / Nº Pedido /  Auftragsnr: 

2198/09

 Date 

/ Fecha /Datum: 

22/10/2013

 Reference

 / Referencia / Referenz: 

Sala 1 Hospital Clínico

 Comments 

/ Observaciones / Bemerkungen:

Read manual of instructions

 / Lea el manual de instrucciones / Betriebs- und 

Wartungsvorschriften beachten.

Do not drill the machine

 / Maschine nicht durchbohren / No taladrar la máquina

Special attention in the connection nuts-coil

 / Besondere Vorsicht an der 

Registerverschraubung/ Especial cuidado en la conexión tuercas-batería .

Recycle or arrange the residues according to the current rules

 / Recicle o gestione 

los residuos según la normativa vigente. Bitte, entsprechend der gültigen 
Gezetzgebung recyclen.

NL

1000

1150

1300

1450

1600

1750

Weights

 (1) 

(kg) 18,5

21

23

25,5

28

30,5

- The device must be stored at a dry, clean, safe location

where no damage to the device can occur, i.e., outside

corrosive atmospheric influences.

- Leave the protections attached ex works (film, tapes, pal-

lets, etc.) on the device, unless they have already been re-

moved beforehand.

- Cover the device with tarpaulins, in order to protect it from

dust, moisture and extreme temperatures.

- Entries, openings and pipes must be hermetically sealed

with dust caps.

Should manufacture-related damage be detected

on the device, please contact your local sales office

prior to installation.

The unit shall only be held in position or moved 

by holding on to the housing. The weight must not

rest on the water connections.

SCHAKO cannot be held liable for damage to the

unit caused by improper handling or handling not

mentioned here, loading or unloading.

Summary of Contents for DISA-B

Page 1: ...Ferdinand Schad KG Steigstra e 25 27 D 78600 Kolbingen Telephone 49 0 74 63 980 0 Fax 49 0 74 63 980 200 info schako de www schako de Installation Mounting and Maintenance DISA B DISA B...

Page 2: ...tion of the delivered model 4 Function 4 Installation and commissioning 5 Operating conditions 5 Material reception 5 Transport lifting and handling 5 Storage 5 Installation 6 Mounting 6 Hydraulic con...

Page 3: ...acement of defec tive materials Recycling The inspection installation hydraulic connection and com missioning of the device must be carried out by qualified skilled personnel only in compliance with t...

Page 4: ...nd heating or optionally 2 pipe system cooling or heating The registers consist of cop per pipes 12 mm in thickness aluminium ribs a steel frame and a manual ventilation and drainage system Grid 3 Lou...

Page 5: ...150 Total length 1150 mm M Position of primary air plenum box central WS1 Water connection left AS1 Number of connection pipes 1 connection pipe arranged cen 123 Diameter of the connection pipes 123 m...

Page 6: ...ory authori ties and adjusted in height later on Hydraulic connections Make sure that places that are intended as openings for air admission and air discharge are free of pipes electric cables crossbe...

Page 7: ...rature controls The temperature controls are mounted in accordance with the selected model This is why the instructions enclosed with each model must be followed However in order to achieve optimum me...

Page 8: ...e access for carrying out the maintenance activi ties has been provided Use the on site ventilation device to ensure that no air re mains in the register and the circuit The connecting and fastening e...

Page 9: ...y may impair or damage the materials of theMainte nance DISA B galvanised steel aluminium and copper and the surface coatings paints and anodised surfaces If there are larger differences in distance b...

Page 10: ...ressure transducer must be closed again The values read on the meter and the following formula can be used to to determine the volumetric flow V l s Primary air flow Ps Pa Static pressure The K value...

Page 11: ...draulic system Ventilation of the hydraulic system Please inform the installer Installed unfavourably or malfunctions at the temperature control or sensor Install thermostat in a different place Clogg...

Reviews: