
21
10.0 MAINTENANCE
A suitable maintenance is also compulsory to get a
maximum machine life and optimal working conditions for
machine's efficiency.
A regular maintenance interventions should be performed by
a well trained safety responsible and if possible by a
mechanical engineer.
Attention:
Regular and scheduled
maintenance interventions cannot be
penformed by running machine. The main
switch must be tuned off. Besides, warning
signal telling, "DO NOT ACTNATE-
MACHINE IN MAINTENANCE" must be
clearly visible on the machine.
Attention: Any processing system, which may
endanger the machine safefy, must be
avoided
As the machine does not include any kind of hydraulic system, it is simple to lubricate its
functional parts as shown in the below.
Firstly, turn off the machine if it is active by moving the main switch °0° on the electric box.
Remove the back lid by dismantling its screws.
Grease the power joints inside the machine with the help of an oilfeeder (*).
Also grease the upper roll adjustment
shaft (shown by X points in figure 1)(**).
Lubricate the reduction gearbox with OIL SAE 30 (illustrated by point Yin figure 1).
After the lubrication, assemble again the back lid and the protections.
Restart the machine according to the start procedure, and check if there are any anomalies
due to faults or unintentional tampering during maintenance.
Attention:
For replacement of oil, use a funnel with a filter in order to avoid that impurities
enter into the gearbox or among the other movable parts
( ) and damage the good
functioning of the machine.
Internal cleaning of the electric box is also needed and must be done like in the following:
1. Turn off the machine moving the main switch on the electric box '0".
2. Disconnect the mains supply from the electric board.
3. Open the electric box lock.
4. Do not use liquid detergents while cleaning the electric box inside.
5. Check the connections to the terminals of the different devices.
6. Tighten any loose connections.
7. Close the door of the electric box and check if it is closed perfectly enough.
8. Connect the electric board to the mains.
9. Restart the machine according to the start procedure, and check if there are any
anomalies because of faults or unintentional tampering during maintenance.
Summary of Contents for PV 30
Page 9: ...9 5 0 STANDARD ROLLER DIMENSIONERS FOR PV 30 ...
Page 12: ...12 ...
Page 14: ...14 ...
Page 19: ...19 ...
Page 22: ...22 11 0 Parts listes 11 1 Main Body Parts ...
Page 23: ...23 11 2 Parts and Parts List of The Main Frame ...
Page 26: ...26 Special lateral angle guides ...
Page 28: ...28 These options belong to a standard machine ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...