OPM 200 en-GB
79
©
Scania CV AB 2014, Sweden
Preparing the engine for storage
Storage
After the preparations, the engine should be
stored in a dry and warm place (room tempera-
ture).
When the engine is to be taken into
operation again
1.
Remove plugs and tape from coolant connec-
tions, air intakes and exhaust pipes.
2.
Fill the cooling system with coolant. For
more information refer to Inspections.
3.
Check the oil level in the engine or top up
with fresh engine oil.
4.
Lubricate the valve mechanisms and their
pushrods and valve tappets as well as the in-
jector mechanisms with plenty of oil.
5.
Drain the preservative fuel from the fuel
manifold and fuel filter.
6.
Connect and bleed the fuel system. For more
information refer to the section headed In-
spection.
7.
Wash off any preservative oil on the outside
using white spirit.
If the engine is equipped with an SCR system
which has been drained and cleaned:
8.
Fill the reductant tank with reductant.
Property of American Airlines