background image

2

R

Section 2

2.1 ASSEMBLY INSTRUCTIONS - CUTTER 
DECK AND BLOWER COMPONENTS

- NOTE -

Use the illustrated parts list as a part number 
reference when following the assembly 
instructions.

-IMPORTANT-

When installing this grass catcher on a machine, 
one of the following Installation Kits will be needed 
to complete the installation.

SVRII-48V - Installation Kit p/n 901M 

 

SVRII-52V - Installation Kit p/n 901N 

 

SVRII-61V - Installation Kit p/n 901P

-NOTE-

When installing this catcher on a model with serial 
numbers M9500001-N0199999, a new rear belt 
cover (p/n 427917) will need to be ordered and 
installed to provide clearance for the mounting 
bracket. 

1.  Remove all packaging materials.  Lay out the 

mounting hardware and the catcher assembly parts 
for easy access.  Prepare the work area making sure 
that it is a clean and safe environment.

 WARNING

Do not operate without discharge chute, mulch 
kit, operator controlled discharge chute (OCDC), 
or entire grass catcher installed.

2.  Remove the discharge chute from the cutter deck.  

See Figure 2-2.

- NOTE -

Do not discard the discharge chute or mounting 
hardware.  The discharge chute MUST be 
reinstalled any time the grass catcher has been 
removed from the machine.

3.  Remove the right side belt cover to gain access to 

the spindle assembly. See Figure 2-2.

- NOTE -

Retain the original belt cover.  This cover MUST be 
reinstalled any time the complete catcher system 
is removed.

Height Alignment

Tool

Height Alignment

Tool

Figure 2-1. Height Alignment Tools

4.  Remove the belt and install the grass catcher pulley 

onto the spindle assembly. Make sure to mount the 
pulley 3" from the top of the deck support plate to 
the center of the groove of the bottom pulley (use 
the height alignment tools, included with this kit, for 
increased accuracy, p/n 428125, See Figure 2-1). 
Install the pulley with the hub inverted, using 1/4-20 
x 2½" bolts (p/n 04001-225). See Figure 2-2. (The 
height alignment tools may "push out" as the pulley 
is tightened to the hub, this is normal)

REMOVE DISCHARGE
CHUTE AND 
HARDWARE

RIGHT SIDE OF

CUTTER DECK SHOWN

(Note: Some parts not shown for viewing purposes.) 

REMOVE EXISTING 
RT. SIDE BELT 
COVER

INSTALL NEW PULLEY
ON RH SPINDLE SHAFT
MAKE SURE TO MOUNT PULLEY 3”
FROM TOP OF DECK SUPPORT PLATE
TO PULLEY GROOVE OF BOTTOM PULLEY.

INVERT HUB

1/4-20 x 2-1/2” Bolt
Torque to 75 in. lbs.

Figure 2-2. Discharge Chute Removal

5.  Remove the turbo baffle from the cutter deck.  Using 

5/16-18 x 1" bolts (p/n 04001-09), 5/16 flatwasher 
(p/n 04040-15), and 5/16 elastic stop nuts (p/n 
04021-10) install the catcher turbo baffle. See Figure 
2-3. (baffles have p/n's on them)

Summary of Contents for GC-VRII

Page 1: ...n for your Scag mower accessory Reading this manual can provide you with assistance in maintenance and adjustment procedures to keep your mower accessory performing to maximum efficiency The specific...

Page 2: ...g any maintenance or service stop the machine and remove the spark plug wire and ignition key If a mechanism becomes clogged stop the engine before cleaning Keep hands feet and clothing away from powe...

Page 3: ...ravel direction 1 3 SAFETY AND OPERATING INSTRUCTIONS NOTE To avoid personal injury it is imperative that all safety instructions be observed 1 Read this operator s manual and the operator s manual th...

Page 4: ...3 Remove the right side belt cover to gain access to the spindle assembly See Figure 2 2 NOTE Retain the original belt cover This cover MUST be reinstalled any time the complete catcher system is rem...

Page 5: ...01 32 3 8 flatwashers p n 04041 07 3 8 lockwasher p n 04030 04 and 3 8 16 elastic stop nut p n 04021 09 Do not fully tighten the hardware at this time See Figure 2 4 through Figure 2 6 NOTE When insta...

Page 6: ...iage Bolt 3 8 16 x 1 1 4 Bolt 3 8 Elastic Stop Nut 3 8 Flange Elastic Stop Nut 3 8 Serrated Flange Nut 3 8 Elastic Stop Nut 3 8 Serrated Flange Nut 5 16 Serrated Flange Nut 1 2 Serrated Flange Nut 3 8...

Page 7: ...h the strap NOTE When installing this catcher the discharge hose may need to be shortened Follow the steps below when required 18 Lower the cutter deck on the machine to the lowest cutting height 19 I...

Page 8: ...le to the inside of the weight See Page 21 for the correct number of weights required 4 Check all hardware for tightness 5 Operate and test 7 16 Elastic Stop Nut 1 2 Flange Elastic Stop Nut 7 16 Lockw...

Page 9: ...blower assembly to the cutter deck and remove the blower assembly See Figure 3 1 MOUNTING PIN HAIR PIN MOUNTING BRACKET QUICK PIN RIGHT SIDE OF CUTTER DECK SHOWN Note Some parts not shown for viewing...

Page 10: ...First 10 X Check all hardware for tightness X Inspect hose and adapter X Check belt for proper alignment X Inspect fabric bags X Check screen in hopper Remove debris from screen X Inspect hose and ad...

Page 11: ...ection 5 5 1 SCAG APPROVED ATTACHMENTS AND ACCESSORIES Attachments and accessories manufactured by companies other than Scag Power Equipment are not approved for use on this machine ILLUSTRATED PARTS...

Page 12: ...m ovin g A B C D E E W A R N IN G IN S T A L L B E L T C O V E R B E F O R E O P E R A T IN G M A C H IN E RE AD OP ER AT OR S MA NU AL 1 1 7 2 2 2 2 3 3 3 6 11 12 12 13 13 18 23 28 33 33 38 43 48 53...

Page 13: ...er Belt 48 and 52 Belt 61 Idler Arm Assembly 48 52GC VRII INCL 9 15 16 17 19 20 25 26 27 Idler Arm Assembly 61GC VRII INCL 9 15 16 17 19 20 25 26 27 Bolt 3 8 16 x 2 Nut Serrated Flange 3 8 16 Bolt 3 8...

Page 14: ...ection 5 UNDER SIDE OF VELOCITY PLUS CUTTER DECK SHOWN 1 2 2 3 3 4 4 5 6 6 7 8 9 31 10 10 10 12 11 13 14 15 16 17 18 19 20 21 22 23 24 24 25 27 26 28 29 29 29 30 30 28 25 GC VRII BLOWER MOUNTING COMPO...

Page 15: ...OD Double Groove 48 Pulley Double Groove 52 Pulley Double Groove 61 Hub Tapered 1 125 Nut Lock Elastic Stop 3 8 16 Bolt 3 8 16 x 1 Washer Flat 3 8 391 x 938 x 105 Washer Lock 3 8 Spring Mounting Post...

Page 16: ...3 13 17 21 25 25 26 27 27 27 28 29 33 34 34 35 36 37 38 38 30 31 32 9 10 14 18 22 11 15 19 23 12 16 20 24 6 6 7 9 10 11 13 13 13 7 7 9 9 10 10 6 6 11 9 9 17 18 18 9 9 19 19 19 6 24 26 6 1 1 1 29 6 1...

Page 17: ...Seal Washer Flat 3 8 391 x 938 x 1046 Nut Lock Elastic Stop 3 8 16 Spacer GC Hitch Spring Hood Hinge Sleeve Hydro Linkage Bolt 3 8 16 x 4 Bushing Hopper Pivot Hinge Upper LH Spacer J Pull Rod Plate S...

Page 18: ...16 R Section 5 GC 2B 2017 BSC 1 2 4 15 17 17 16 16 3 6 7 3 8 9 10 11 12 13 14 5 GC VRII BAG SUPPORT COMPONENTS...

Page 19: ...23197 04040 15 04019 03 427476 04041 11 04001 10 Pop Rivet 3 16 x 652 Seal GC Hood Retainer Seal Nut Center Lock 1 4 20 Nut Elastic Stop 5 16 18 Bag Assembly Frame Weldment Bag Support Bolt 1 4 20 x 3...

Page 20: ...18 R Section 5 5 6 7 7 7 7 7 7 7 7 8 8 8 8 8 1 2 2 2 2 2 4 3 3 13 17 9 10 14 14 14 18 11 15 19 12 12 16 16 20 20 GC VRII SUPPORT FRAME COMPONENTS...

Page 21: ...3 8 16 Bolt Serrated Flange 1 2 13 x 1 Mainframe Weldment SVRII Bolt Carriage 3 8 16 x 2 Bolt Carriage 3 8 16 x 1 Bolt 3 8 16 x 1 Nut Lock Elastic Stop With Flange 3 8 16 Bracket Weldment GC Mounting...

Page 22: ...20 R Section 5 1 1 2 2 3 4 4 5 5 6 7 7 8 9 10 GC VRII FRONT WEIGHT COMPONENTS...

Page 23: ...04 04001 117 485172 04001 153 426093 484758 427852 Nut Lock elastic Stop 7 16 14 Washer Lock 7 16 Spring Mounting Bracket Weight Bar LH Nut Lock elastic Stop With Flange 1 2 13 Bolt 7 16 14 x 1 Pin We...

Page 24: ...22 R Section 5 483402 482275 482733 483391 483039 483393 483392 483391 483393 GC VRII DECALS 484696...

Page 25: ...es not cover any accessory that has been altered or modified In addition the warranty does not extend to repairs made necessary by normal wear or by the use of parts or accessories which in the reason...

Reviews: