![Scag Power Equipment GC-2B Operator'S Manual Download Page 6](http://html1.mh-extra.com/html/scag-power-equipment/gc-2b/gc-2b_operators-manual_1205810006.webp)
4
R
Section 2
FRONT SIDE
IDLER PULLEY
BACK SIDE
IDLER PULLEY
BLOWER
PULLEY
SPINDLE
PULLEY
Figure 2-9. Belt Routing
18. Install the new belt covers supplied and secure.
See items number 5 and number 14 identified on
the appropriate Blower Mounting Components page
18 of the illustrated parts section provided in this
manual for proper installation.
2.3 ASSEMBLY INSTRUCTIONS -
DISCHARGE AND HOPPER COMPONENTS
1. Install the left and right side grass catcher mounting
brackets to the rear of the machine. Secure using (4)
3/8-16 x 1" hex head bolts and (4) 3/8-16 serrated
flange nuts. See Figure 2-10.
3/8-16 SERRATED
FLANGE NUT
3/8-16 x 1” BOLT
Figure 2-10. GC Mounting Bracket Installation
2. Tighten the hardware.
-NOTE-
52 Blower mounting post shown below for
reference.
ELASTIC STOP
NUT
FLATWASHER
FLATWASHER
BOLT, 3/8-16 x 1-1/4”
LOCKWASHER
Figure 2-7. Blower Mounting Post Installation
14. Install the blower assembly to the mounting bracket
and secure with the mounting pin and hair pin. See
Figure 2-8.
15. Align the blower assembly with the discharge
opening of the cutter deck. Tighten the hardware for
the mounting bracket. See Figure 2-8.
16. Install the quick pin through the rear hole in the
discharge chute mounting bracket. See Figure 2-8.
BLOWER
ASSEMBLY MOUNTING
PIN & HAIR PIN
QUICK PIN
MOUNTING POST
TIGHTEN HARDWARE
TIGHTEN HARDWARE
Figure 2-8. Blower Installation
17. Install the belt to the spindle pulley. When replacing
the belt. See Figure 2-9.