Assembly and operating instructions AWD3D5WD
Three-phase active power energy meter with serial Modbus interface, Pic. 1
Description
Energy meter with serial Modbus interface enables the rea-
ding of all relevant data like consumption, current, voltage
and power (active and reactive).
Indicating elements (Pic. 4)
T1total (kWh)
■
Shows total consumption
T1part. (kWh)
■
Shows partial consumption, this
value is resettable
CT
■
Shows the set current transformer
ratio
Select
■
The transformer ratio can be
selected in Menu item Select, in
the open bridge Z1-Z2
P(kW)
■
Shows the instantaneous power
per phase or all phases
U(V)
■
Shows the voltage per phase
I(A)
■
Shows the current per phase
kWh
■
Shows the unit kWh when the
consumption is displayed
L1 / L2 / L3
■
For P-, U-, I- or Error display, the
corresponding phase is displayed
Error
■
In case of missing phase or wrong
current direction. The correspond-
ing phase is additionally displayed.
Technical data
Connection
■
Pic. 2
diagram
Dimensions
■
Pic. 3
Accuracy class
■
B according to EN50470-3,
1 according to IEC62053-21
Reference, Maxi-
■
I
ref
= 5 A, Ima
x =
6 A, Ist =
1
0 mA
mum, initial current
operating voltage
■
3 × 230/400 V
AC
, 50 Hz
Tolerance −20%/+15%
Counting range
■
000 000,0…9 999 999 kWh
LED-Ouptut
■
10 Imp/kWh
Connections
■
Conductor cross-section 1,5−16 mm
2
,
Main circuit
screwdriver pozi no. 1, slot no. 2,
torque 1,5−2 Nm
Connections
■
Conductor cross-section max. 2,5 mm
2
,
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
■
−25 … +55°C (noncondensing
temperature
according standard EN50470)
Environment
■
Mechanical M2
Electromagnetic E2
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to condensa-
te build-up, acclimatise the meter at room temperature
for about half an hour before connecting.
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.
Declaration of Conformity CE
We, Saia-Burgess Controls AG, CH 3280 Murten (Switzer-
land), herewith declare, on our own responsibility that
the products:
■
AWD3D5WD00C3A00
which this certificate refer to, are in accordance with the
directive 2004/22/EG (MID) and the following standards:
■
EN50470 parts 1 and 3 (electronic meter), of
October
2006.
Murten, 30.04.2013
Conformity Assessment Body:
METAS-Cert, Nr. 1259
CH-3003
Bern-Wabern
Signed: Jean-Paul Costa, Head of development
English
Installation instructions
The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
Operation of the LCD display
See page with LCD menu navigation.
The bridge Z1-Z2 should be removed for adjusting the
transformer ratio.
4 319 5114 0b
09.2013
Subject to change without notice
Wiring diagram
The secondary, mains current transformer
connection is to be connected to the phase to
be measured and therefore the transformer
don’t have to be grounded.
This connection is to be fused according to the local
installation instructions.