SP-5 Operator Manual
3
BEFORE INSTALLATION
NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit is
found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to “Shipping
Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate Savory’s or
your ability to file claims and receive compensation for shipping damage.
This manual contains important safety and installation-operation instructions. Require all operators to read this manual
before using the unit. Failure to follow the instructions contained in this manual may cause injury, damage to the unit,
and will void the warranty.
INSTALLATION
ELECTRICAL REQUIREMENTS
1. DEDICATED LINE – No other equipment may be connected to this line.
2. CORRECT VOLTAGE – The voltage is specified on the data plate. This is not a dual voltage unit. Check voltage
with a meter to ascertain actual voltage (i.e. 208V or 240V).
3. SUPPLY CONNECTION WIRE GUAGE:
1 Phase – No. 8 AWG
3 Phase – No. 10AWG
Wire to be suitable for at least 60° C
4. TERMINAL
BLOCK
CONFIGURATION:
SHIPPING WEIGHT
CUBE
MAXIMUM KW AMPERAGE (PER LEG)
242 lbs.
110 kg.
27 6
Single
Phase
208V – 28.9
240V – 25.0
Voltage
208V or 240V, single or three phase.
Equipped for field service connection.
Three Phase
208V – 16.7
240V – 14.5
Summary of Contents for SP-5
Page 12: ...SP 5 Operator Manual 12 ...