Saunier Duval THELIA 23 Installation And Operating Instructions Manual Download Page 20

20

Refer to table 

for the cutting lengths of both the

PVC and the aluminium flue pipes for each of the
various flue options available.
Important. All cutting lengths must be measured
from the locking fitting end of the flue pipes, see

diagram 35

.

Extension kits

When the distance 

measured on site is greater

than given in table 1, a flue extension kit will be
required, refer to 

table 2

.

Assembly of extended flue

The flue extension kit, see 

diagram 36

, comprises:

- PVC pipe .............................................................

A

- PVC connector ...................................................

B

- Aluminium pipe with fitted connector ............

C

- Triangular pipe support ......................................

D

- Two fixing screws .............................. (

not shown

)

Diagram 35

Cutting length

PVC pipe

Aluminium pipe

Cutting length

Locking fitting end

Diagram 36

A

B

D

C

REAR OUTLET FLUE ASSEMBLY

Fixing  screws

Connector

Aluminium
extension
pipe

Flue option

Dimension "X"

N

°

 of

extension kits

Side flue

797 to 1527 mm

1

(left)

1527 to 2257 mm

2

Side flue

739 to 1469 mm

1

(right)

1469 to 2199 mm

2

Table 2

Important : 

all cutting lengths should be measu-

red from the locking fitting end of the pipe.
Check before cutting. If the distance between the
end of either of the cut pipes or the pipe connec-
tor will be 30 mm or less, refer  to 

diagram 39

, it will

be necessary to reduce the length of both the PVC
and aluminium extension pipes, and those sup-
plied with the boiler, to achieve the required ove-
rall cutting length for the extended flue pipes.

Note : 

if the length of any aluminium pipes other

than the final extension pipes have to be redu-
ced in this way, it will be necessary to drill two fixing
holes in these pipes to match the fixing holes in
the aluminium connector.

The PVC connector is used to connect the PVC
extension pipe to the PVC pipe supplied with the
boiler or to another extension pipe, if more than
one is used. It is a secure push fit onto the pipe
ends, no adhesive is required.
The connector fitted to the aluminium extension
pipe is fitted to the next extension pipe, if more
than one is used. The two screws provided must
be used to fasten the two pieces together once
assembled, using the pre-drilled holes in both the
connector and pipe end, see 

diagram 37

.

The triangular pipe support should be slid onto the
aluminium pipe before final assembly and positio-
ned near the pipe joint to support and locate the
inner pipe correctly within the outer PVC pipe.

Cutting lengths for extended flues

Using the correct  number of the extension kits, as

table 2

, assemble both the extended PVC and

aluminium pipes by adding the extension pieces
to the flue pipes supplied with the boiler. Do not
fasten the aluminium pipes together at this stage.
Mark and cut both extended flue pipes, referring
to 

diagram 38

, using the cutting lengths given in

table 1

.

Table 1

Cutting length (mm)

Flue option

PVC

aluminium

Comments

outer pipe

inner pipe

Back outlet

e + 70

e + 195

maximum

Rear flue

wall thickness "e"

without

extension 511 mm

Back outlet

e + a + 35

e + a + 155

maximum

Side flue to left

distance "X"

(diagram 5)

without

 extension 797 mm

Back outlet

e + a + 90

e + a + 215

maximum

Side flue to right

distance "X"

(diagram 6)

without

extension 739 mm

V

en 083

V

en 084

V

en 085

Aluminium

flue pipe

Diagram 37

Summary of Contents for THELIA 23

Page 1: ...1 THELIA THIS IS A CAT II2H3 APPLIANCE 01773 828100 IN WARRANTY TECHNICAL HELPLINE 01773 828400...

Page 2: ...marked on the label attached to the inside of the door Refer to the Introduction section page 3 for a description of the basic functions of the boiler The Users section describes how to safely operate...

Page 3: ...2H3 Gas Category for use with natural gas G20 as distributed in the United Kingdom or with butane or propane gas G30 31 These instructions should be carefully followed for the safe and economical use...

Page 4: ...043a Hab 130 Note On pressing the ON button the fan will be heard to run at full speed after which the ignition sequence will start and the pilot will light Should the pilot fail to remain alight or g...

Page 5: ...33 Diag 7 HEATING HOT WATER Place the selector lever diagram 4 to position winter In this position the domestic hot water will have PRIORITY HEATING ONLY Turn the selector switch diagram 8 to position...

Page 6: ...four hour format for example 1300 for 1pm see diagram 12 Helpful Hint The and buttons are used to change times Press and release for small changes If you press and hold down the time will run To Set...

Page 7: ...ton again The display will now show the first Off time you have just entered Repeattheabovefortheremaining On and Off times When you have set the On and Off times you require place the slide switch to...

Page 8: ...during a holiday After the programmed time has gone by the boiler returns to its normal programmes To set the Hold or Holiday feature carry on as follows Place the slide switch to Timer the letter h w...

Page 9: ...boiler The valve MUST NOT BE TOUCHED except by a competent person If the valve discharges at any time switch the boiler off and isolate it from the electrical supply Contact your installation servic i...

Page 10: ...e in sanitary hot water mode l min 3 3 Specific flow rate for 30 C temperature rise l min 11 11 Mini supply pressure bar 0 3 0 3 Max supply pressure bar 10 10 Electrical supply V 230 230 230 Amperage...

Page 11: ...pen open 1 turn open 3 turns open 2 turns Pressure loss between flow and return boiler connections metres head Heat output kW 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3 Btu h 30387 34142 37557 40...

Page 12: ...ver 8 Expansion vessel 9 Pump 10 Automatic air vent 11 Burner 12 Heat exchanger air vent 13 Heat exchanger 14 Multi functional control 15 Safety electrovalve THELIA 23 E only 16 Hight limit thermostat...

Page 13: ...23 Airflow switch A Heating return C Heating flow F Gas inlet 1 ON push button 2 OFF push button 3 Spark generator 4 Central heating water temperature adjustment 5 Temperature gauge 6 Pressure gauge 8...

Page 14: ...5a A Heating return with isolating valve m B Cold water inlet with isolating valve p C Heating flow with isolating valve q drain screw r and safety valve s D Domestic hot water out E Electrical connec...

Page 15: ...e with any type of installation Heating surfaces may consist of radiators convectors or fan assisted convectors Caution if the materials used are of different types corrosion phenomena may develop In...

Page 16: ...emplate on wall in required position mak ing allowance for the necessary clearances etc Mark the position of the holes for the hook and the connecting plate Drill plug and fix the connecting plate and...

Page 17: ...t window 400 F from an adjacent air vent 600 G from vertical or horizontal air pipes 600 H from an external corner of the building 300 I from an internal corner of the building 1000 L from the ground...

Page 18: ...e installation of this boiler must be carried out by a competent person in accordance with the relevant requirements of the current issue of The Gas Safety Installation and Use Regulations The Buildin...

Page 19: ...29 E F D C B A 234 50 mini 29 60 255 mini Diagram 30 Cutting the flue hole Making allowance for the slope of the flue cut the hole in the external wall preferably using a 115 mm diameter core drill I...

Page 20: ...redu ced in this way it will be necessary to drill two fixing holes in these pipes to match the fixing holes in the aluminium connector The PVC connector is used to connect the PVC extension pipe to...

Page 21: ...m 41 Important the gas connection must be made first as there is no flexibility in this connection Do not forget the sealing washer Connect the aluminium pipe onto the central outlet of either the str...

Page 22: ...plate to leave fan outlet pointing upward Using the alternative set of three holes in the mounting plate fasten the fan to the mounting plate see diagram 45 Disconnect air pressure switch tube from re...

Page 23: ...d see diagram 41 Important The gas connection must be made first as there is no flexibility in this connection Do not forget the sealing washer Fit the internal plastic flange Q Push it along the pipe...

Page 24: ...any of the terminals of this plug All models In case of difficulty obtaining a suitable timeclock room thermostat a programmable room thermo stat is available as an accessory Saunier Duval part number...

Page 25: ...plug Voltage free room thermostat Do not connect Voltage free room thermostat Do not connect Voltage free cylinder thermostat External controls plug Time clock External controls plug Timeclock room th...

Page 26: ...Filling the system With the selector diagram 51 or 52 in the winter position or open the shut off valves q m and p diagram 53 the slot of the screw corres ponds to flow direction the bleed plug situat...

Page 27: ...he left hand position Gas pressures The main burner pressure should be checked dur ing commissioning to make sure the correct in put is obtained Proceed as follows Shut down boiler Remove screw from t...

Page 28: ...ure shown on the pressure gauge diag 58 is less than 1 bar the system must be filled up immediately Call the nearest after sales service department Air in the heating system Persistent air in the heat...

Page 29: ...run when the burner is lit and will continue to run after burner extinction This can be useful on certain installa tions that requireconstant heating water circula tion To change the pump operation t...

Page 30: ...30...

Page 31: ...31...

Page 32: ...32 Le Technipole 8 av Pablo Picasso 94132 Fontenay sous Bois cedex T l phone 1 49 74 11 11 T lex 262 958 T l copie 1 49 74 11 01 102740 D 08 96...

Reviews: