5
221873B
Diagram 2
GAS
SERVICE
COCK
HOT
WATER
OUT
COLD
WATER
SUPPLY IN
HEATING
FLOW
HEATING
RETURN
LEVER (OPEN)
COLD WATER
SUPPLY IN/OUT
Instructions for Use
SLOT (OPEN)
GAS SERVICE
COCK
LEVER (OPEN)
HEATING
FLOW/ RETURN
7013
SAFETY VALVE
DISCHARGE PIPE POSITION
Summer / Winter Selector Button
Adjust the central heating water temperature control knob “N” to
desired setting.
For central heating set button “J” to Winter light “K” will illuminate.
The main burner will light. The burner ON light “D” will
illuminate.
When the heating is controlled by a room thermostat and/or a
time switch, button “J” must be set to Winter light “K” will
illuminate.
If a hot water tap is opened while the boiler is on for heating,
priority will be given to hot water.
To turn the heating off for short periods, set button “J” to summer
“Off” light “L” will illuminate.
To turn on again set button “J” to winter “On”, light “K” will
illuminate.
To Turn the Boiler Off
To turn the boiler off, set switch "B" to O.
To turn on again follow the operating instructions.
Maintenance and Servicing
To ensure the continued efficient and safe operation of the
appliance it is recommended that it is checked and serviced as
necessary at regular intervals. The frequency of servicing will
depend upon the particular installation conditions and usage,
but in general once a year should be enough.
If this appliance is installed in a rented property there is a duty
of care imposed on the owner of the property by the current
issue of the Gas Safety (Installation and Use) Regulations,
Section 35.
Servicing/maintenance should be carried out by a competent
person in accordance with the rules in force in the countries of
destination.
To obtain service, please call your installer or Heatcall (Saunier
Duval's own service organisation) using the telephone number
behind the controls cover door.
Please be advised that the ‘Benchmark’ logbook should be
completed by the installation engineer on completion of
commissioning and servicing.
All CORGI Registered Installers carry a CORGI ID card, and
have a registration number. Both should be recorded in your
boiler Logbook. You can check your installer is CORGI registered
by calling CORGI direct on :- 01256 372300.
Clearances
The boiler requires a clearance in front, below and at the sides
of the casing for safety, servicing and maintenance access, see
diagram 2.1.
Protection Against Freezing
The boiler has a 2 stage built in frost protection. Provided power
and gas are available and there is adequate pressure in the
system, if the water temperature within the appliance falls below
10
o
C approx. the pump only will come on. If the water temp
continues to fall to 6
o
C approx. the main burner will fire at min
rate until the water in the appliance is greater than 15
o
C approx.
This is a separate function to any remote frost protection fitted.