8.

 

Apply power to the device. The button will blink continuously between green and amber to 
indicate that the device is in factory reset state. If the device is not in its factory reset state 
when it is initially powered up, it can be reset by pressing and holding the front panel button 
for at least 10 seconds, until the button starts to blink continuously between green and 
amber. 

 

5.3

 

Commissioning  

To complete the installation process, the SS9007 Mini CT Meter must be joined to an existing ZigBee 
network. The following instructions apply specifically to networks based on the Saturn South ESBox 
Ethernet-ZigBee Gateway device, however the process will be very similar when using third party 
ZigBee coordinators. 

1.

 

Set the site's ESBox to ‘Permit Joining’ mode using the LSSS button sequence on the button 

on the back panel of the ESBox (see the SS9002 ESBox LT documentation for more 
information). When Permit Joining mode is successfully enabled, the EBox's ZigBee LED will 
blink green for 120 seconds. During this 120 second window devices may be joined to the 
network by repeating step 2. 
 
If this site is being commissioned for the first time it is recommended that a factory reset be 
performed on the ESBox before activating the first device using the Factory Reset (LLLSS) 
button sequence. 
 

2.

 

Instruct the new Mini CT Meter to join the network by pressing and holding the front panel 
button for 5 seconds and then releasing it. The button will glow solid green to indicate that 
the device is scanning for available networks. The device will then spend up to 10 seconds 
attempting to join the ZigBee network. If the device joins the network successfully, the 
button will flash green for 6 seconds. If the device fails to join the network, the button will 
flash amber for 6 seconds. Please see the Troubleshooting section for more information on 
debugging connection issues. 
 
When joining multiple devices, perform the Association Join button sequence on each device 
in turn, rather than entering the sequence on multiple devices at once. 
 

3.

 

If the device successfully joins the network, as indicated in step 2, verify that the device 

appears as ‘connected’ in the out

-of-band secure ESCo web management interface, and that 

it is reporting power metrics. 

 

 

 

Summary of Contents for SS9007.2 Mini

Page 1: ...D401 2 5 30 Dec 2015 SS9007 2 Mini CT Meter User Manual Version 5 Std HA Release build 5977...

Page 2: ...Specifications 6 5 Commissioning and Installation Instructions 7 5 1 Before Installation 7 5 2 Installation 7 5 3 Commissioning 11 6 Switching 12 7 Metering 13 8 Device Clusters and Attributes 14 8 1...

Page 3: ...ent failure This product is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience or knowledge unless they have been given super...

Page 4: ...ill join any ZigBee HA network with Permit Joining mode enabled When the button is pressed the button colour will change to yellow and then begin to rapidly blink green once is has been held long enou...

Page 5: ...ss 1 with a customizable reporting frequency of up to 1Hz Import export energy accumulations and true signed power measurements make the SS9007 an ideal choice for monitoring renewable generation sour...

Page 6: ...Range 25 C to 80 C Relative Humidity 10 95 non condensing Average Power Consumption 1W Mass 0 080kg Dimensions 60 5 x 90 x 17 5mm Wire gauge 0 1mm2 min 2 5mm2 stranded or 2 5mm2 solid core max IP Rati...

Page 7: ...Commissioning Wire the device into the switchboard as per the guidelines below and apply power 5 2 Installation The SS9007 Mini CT Meter is designed to be straightforward to install into a standard do...

Page 8: ...terminals 5 Clip the CT on to the target load conductor ensuring that the arrow on the CT points towards the load or generator away from the grid Connect the output of a MCB RCD or other protection de...

Page 9: ...connected in the correct polarity to ensure proper operation The Live terminal Neutral terminal two Current Transformer CT terminals CT BLACK and CT WHITE and two SWITCH terminals are marked on the s...

Page 10: ...monitoring 7 If your Mini CT Meter has switching capability the two terminals marked SWITCH are connected internally to an isolated relay rated for 5A at 240V The front panel button will glow amber t...

Page 11: ...econd window devices may be joined to the network by repeating step 2 If this site is being commissioned for the first time it is recommended that a factory reset be performed on the ESBox before acti...

Page 12: ...to a digital IO on a control device such as a PLC The example below shows a SS9007 Mini CT Meter being used to control an external contactor with a 240V coil by switching the active input to the conta...

Page 13: ...plied CT IMPORTANT Attaching a third party CT to the device can damage the device and will void the product warranty SS9007 Mini CT Meter devices have a variant label on the front panel that describes...

Page 14: ...not be possible for a device to send 11 attributes in a single report If the total size of the report exceeds the maximum payload size 60 bytes some attributes will be excluded from the report The de...

Page 15: ...the Simple Metering Cluster on endpoint 10 0x0A Attr ID Attr ID Hex Attribute Name Units Divisor Writeable 57610 e10a Voltage 1 RMS Mean V 100 N 57628 e11c Current 1 RMS Mean A 100 N 57646 e12e Power...

Page 16: ...mit Joining mode Try to join the device again Saturn South metering devices will initially scan a reduced subset of the full range of available ZigBee channels If the network is on a channel that is n...

Reviews: