Satellite PolyPortables Freedom 4 Assembly Instructions Manual Download Page 9

PN 22541 REV B                                                                                - 9 -                                                                 5/18 
 

 
Install Roof: 

36) Make sure front pocket on inside of front is up over 
vertical wall of floor. Front gap between door & right 
facing of front should be 

no more than .250” [6 mm].  

The gap between the facing and the ground should be 
.250 [6mm]. 

37) In right front facing there are 3 
pre-drilled holes in the bottom. With 
front in position on floor transfer 
drill through 3 holes in facing into 
floor 

using 5/16” (.312”) [7.64 mm] 

drill bit. 

38) Install (3) bolts PN 20883 
with (3) washers PN 22584 in 
holes in bottom of front right 
facing into floor. 

  

 

 

 

 

39) On inside of front place (3) washers PN 22584 & (3) nuts 
PN 13131 on bolts in right front facing into floor. Tighten nuts 
on bolts using 

1/2” (.500”) [12.2 mm] socket or socket driver bit 

& 1/2” (.500”) [12.2 mm] Open end wrench.

 

40) Repeat steps 36) through 39) to install bolts & nuts in left 
front facing into floor.

 

  

 

    

 

41) Place roof PN 22518 on unit, with 
hole in roof for vent pipe in left rear 
corner. Pull roof down over vent pipe. 
Align holes in roof with holes in rear & 
side panels. Rivet roof to rear & side 
panels using rivets P/N 11054 installed 
from outside of roof and washers PN 
11315 inside unit on rivets. 

42)  Rivet roof to rear panel using (5) 
rivets P/N 11054 installed from outside of 
roof & (5) washers P/N 11315 inside unit 
on rivets.  

43)  Rivet roof to side panels using (8) 
rivets P/N 11054 per side installed from 
outside of roof and (8) washers P/N 
11315 per side inside unit on rivets. 

 

 

 

Summary of Contents for Freedom 4

Page 1: ...PN 22541 REV B 1 5 18 FREEDOM4 Portable Restroom Assembly Instructions ...

Page 2: ...PN 22541 REV B 2 5 18 FREEDOM 4 ASSEMBLY INSTRUCTIONS ...

Page 3: ...PN 22541 REV B 3 5 18 ...

Page 4: ...enough kit boxes to assemble the number of toilets you are currently working on KEEP PARTS ORGANIZED Staging parts will minimize assembly time Rivet rear side panels to floor 1 Rivet rear panel to floor Position panel on outside of floor so lip extending out from floor fits in bottom channel in panel holes in bottom of panel are in line with holes in floor 2 Rivet rear panel to floor Install 7 riv...

Page 5: ...loor Install 4 rivets P N 22543 from inside unit through holes in floor into holes in panel Place 4 washers P N 11315 onto rivets outside of unit 8 Repeat steps 6 7 riveting right half panel to floor Rivet Half Panels to side Panel Stiffener Tube 9 Rivet Left half panel to left side panel left side panel overlaps left half panel 10 Rivet left half panel left side panel Place stiffener tube PN 2253...

Page 6: ...g a 1 4 250 6 mm Drill bit 15 Use 6 screws PN 18718 with 6 washers PN 11360 on inside of side panel through 6 holes in side panel for mounting lift handle 16 Place lift handle PN 22522 on outside of panel with screws PN 18718 through holes in handle Install 6 washer PN 12382 6 nuts PN 16307 on screws using 3 Phillips Head Driver Bit 7 16 437 11 1 mm socket or socket driver bit Install paperguard 1...

Page 7: ...375 9 53 mm Hex Driver bit 22 Insert vent pipe PN 13796 into tank PN 16538 until it bottoms out against screw 23 Drive fourth screw PN 13860 through rear panel into dimple in finger groove into tank and vent pipe using 3 8 375 9 53 mm Hex Driver bit 24 Drive fifth screw PN 13860 through rear panel into tank 25 Drive fifth screw through rear panel into tank In line with dimple up from dimple as sho...

Page 8: ...rlaps right side half panel Rivet panel to front facing repeat step 34 Install Front assembly 28 Install seat lid PN 10570 comes with plastic bolts nuts on tank PN 14508 Plastic bolts through seat lid hinges into the tank Thread plastic nuts on bolts from inside of tank Position tank in left rear corner of unit 29 Hold tank against panel while installing 3 screws PN 13860 from outside of unit in d...

Page 9: ...3131 on bolts in right front facing into floor Tighten nuts on bolts using 1 2 500 12 2 mm socket or socket driver bit 1 2 500 12 2 mm Open end wrench 40 Repeat steps 36 through 39 to install bolts nuts in left front facing into floor 41 Place roof PN 22518 on unit with hole in roof for vent pipe in left rear corner Pull roof down over vent pipe Align holes in roof with holes in rear side panels R...

Page 10: ...2056 on right facing drill at dimple locations using 10 193 5 mm Drill bit Rivet hasp to facing using 2 rivets PN 11270 through hasp into facing 2 washers PN 11315 on rivets inside of facing 48 Drill out 6 dimples outside of door using 10 193 5 mm Drill bit be careful not to drill through 2nd wall of door facing 49 Rivet handle PN 22522 on outside of door using 6 rivets PN 14427 Install door handl...

Page 11: ...r using 10 193 5 mm Drill bit 57 Fasten closure PN 22536 rod to bracket PN 21382 Place rod on top bracket arm Fasten closure rod to bracket arm with screw PN 18813 and nut PN 14777 using 2 Phillips Head Driver Bit adjustable wrench Just snug screw nut do not overtighten so rod can move 58 Attach door closure to bracket on door with pin provided with closure NOTE adjust closure speed by turning cyl...

Page 12: ...NSTALL GRAB BAR ON REAR PANEL 62 Drill at 5 lower dimple 5 upper vertical 0 locations shown below using 10 193 5 mm Drill bit on inside of panel 2 vertical 0 locations that are used with 2 pre drilled holes in top of Grab bar ...

Page 13: ... in rear panel using 10 193 5 mm Drill bit be careful not to drill through 2nd wall of Grab Bar Install 3 rivets PN 14427 with 3 washers PN 11360 in remaining 3 upper holes in rear panel into Grab bar Install 5 rivets PN 14427 in 5 lower holes in rear panel into Grab Bar as shown below 2 pre drilled holes in top of Grab Bar are in line with 2 vertical 0 holes noted in rear panel 3 rivets PN 14427 ...

Page 14: ...TALL GRAB BAR ON LEFT PANEL 64 Drill at 5 lower dimple 5 upper horizontal ᴑ locations shown below using 10 193 5 mm Drill bit on inside of panel 2 horizontal ᴑ locations that are used with 2 pre drilled holes in top of Grab bar ...

Page 15: ...ill through 2nd wall of Grab Bar Install 3 rivets PN 14427 with 3 washers PN 11360 in remaining 3 upper holes in rear panel into Grab bar Install 5 rivets PN 14427 in 5 lower holes in left panel into Grab Bar as shown below 2 pre drilled holes in top of Grab Bar are in line with 2 horizontal ᴑ holes noted in left panel 2530 Xenium Lane North Minneapolis MN 55441 Telephone 763 553 1900 Fax 763 553 ...

Reviews: