![Satec 3100 Series User Manual Download Page 28](http://html.mh-extra.com/html/satec/3100-series/3100-series_user-manual_1200394028.webp)
Series 3100
PP3123-03-0101
Automatic Burst Test Systems
User’s Guide
SATEC PIPE & PRESSURE
28
7.
When the test is complete, record the maximum pressure and the elapsed time,
as desired. The maximum pressure can be read by pressing the Scroll button
to access the “
LogH
” parameter.
8.
Reset all displays (pressure and time) to zero.
9.
Remove the specimen.
10.
System is ready to test another specimen.
Testing with Multiple Specimen Option
If the system is equipped with the multiple specimen option, testing procedures
are similar to those outlined above except:
1.
Install all specimens (as desired or permitted) in the burst enclosure and purge
air from each specimen. See “Filling a Specimen” on page 26. The
SPECIMEN
dial must be set to each sample as that sample is being purged.
2.
Be sure the
SPECIMEN
dial is set to
1
(or to the specimen that will be tested
first).
3.
Complete steps #2 through #8 of the “Running a Test” procedure on page 27.
4.
Turn the
SPECIMEN
dial to select the next specimen for testing.
5.
Repeat steps #3 and #4 above until all prepared specimens are tested.
6.
Remove all specimens from enclosure(s).
S
HUTTING
D
OWN THE
S
YSTEM
The burst test system should be shut down at the end of each work day to assure
that the pump will not run unnecessarily or run dry. Shut off the main pressure,
power and air supply to the console.
If the system will be stored in an area with below freezing temperatures, the
system must be completely drained. All lines must be blown out with air for
complete drainage. See “System Drainage for Long Term Storage” on page 30.