
MAINTENANCE/INSPECTION PROCEDURE
4-21
(1) Greasing guidelines
Apply grease, with a cleaning patch. Do not use excess
grease. It may come into contact with the tape transport
or drive system. Wipe any excess and clean with clean
ing patch wetted in Isopropyl Alcohol.
(2) Periodic greasing
Grease specified locations every 5,000 hours.
5-2) Greasing
NOTE:Greasing Points
3
5
6
1
2
4
1) Loading Path Inside & Top side
2) Base Tension Boss inside Hole
3) Arm Assembly F/L "U" Groove
4) Arm Take-up Rubbing Section
5) L/D Motor Gear Wheel Part
6) Shaft
7) Arm Assembly F/L of Buming
Inside Hole
8) Reel S, T Shaft (G381:Yellow)
9) Brake T Groove
Guide Rail
Base Loading
Gear Drive
Gear Sector
Gear Cam
Gear Part
Bracket Side (L)
Bracket Assembly Door
5
7
8
1
2
6
4
3
1) Loading Path Inside & Top side
2) Shaft
3) Gear Rack F/L Moving Section
4) Shaft
5) Lever Tension Groove
6) Clutch Assembly D33 Shaft
7) Brake "S" Rubbing Section
Chassis (Top)
Chassis (Bottom)
Guide Rack F/L
Gear Rack F/L
Summary of Contents for HV-DX1E
Page 30: ...MEMO 3 19 ...
Page 32: ...3 32 3 33 2 TU IF NICAM A2 CIRCUIT DIAGRAM EE MODE VIDEO TU MODE AUDIO SANYO SCART ...
Page 35: ...3 38 3 39 5 SCART JACK CIRCUIT DIAGRAM SANYO SCART DX1EV SP DX1UK ...
Page 41: ...3 50 3 51 2 KEY P C BOARD LOCATION GUIDE 3 CLOCK P C BOARD LOCATION GUIDE ...
Page 56: ...3 68 3 69 3 MPEG CIRCUIT DIAGRAM ...
Page 59: ...3 74 3 75 6 SCART JACK CIRCUIT DIAGRAM ...
Page 63: ...3 82 3 83 PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD TOP VIEW LOCATION GUIDE ...
Page 64: ......
Page 65: ......
Page 88: ...4 22 GEAR F R GEAR AY P2 P3 Lever F R Base Tension Boss CAM ...
Page 102: ......
Page 103: ......
Page 125: ...July 02 K SANYO Electric Co Ltd Osaka Japan ...