System Design
4. Center-of-gravity and earthquake resistance
D-15
(1) Installation position and center of gravity
■
Outdoor Unit
1) Position of center-of-gravity
Position of
mounting points
Position of center-of-gravity
Unit weight (kg)
Outdoor unit type
L
1
L
2
L
G1
L
G1´
L
G2
L
G2´
h
G
Excel W Multi model
Type 190 1,000 1,014 435 565 503 511 650
875
For earthquake-resistant design, compare L
G1
and L
G1'
, and L
G2
and L
G2'
, and use the smallest value.
2) Mounting pad (foundation) size
Size
A B C
Ground based
At least
1.150
At least
120
Anti-vibration mount
(none)
At least
1.850
At least
1.450
Anti-vibration mount
(stand-alone type)
At least
2.000
At least
1,600
Type 190
Roof
mounted
Anti-vibration mount
(interconnected type)
1,850 1,600
At least
140
Note: The foundation is either a solid pad, or directly on the floor slab.
3) Size and type of anchor bolts
1) All anchor bolts are M12.
2) Use one of the following types of anchor bolts.
Embedded-type: L-type, LA-type, headed bolts, J-type, JA-type
Boxout-compatible: L, LA, headed, J or JA (however, base dimension C must be at least 180 mm),
post-drilled resin anchors or post-installed male-threaded mechanical anchor bolts.
Female screw anchors provide insufficient pull-out strength, so cannot be used.
L
G
2
h
G
L
2
L
G
2
´
L
G1
h
G
L
1
L
G1´
A
B
C
Broadside (front view)
End-on (side view)
Summary of Contents for ECO G SGP-EGW190M2G2W
Page 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Page 9: ...Outdoor Unit 3 External Dimensions B 5 ...
Page 10: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Page 13: ...Outdoor Unit 6 Operating Sound Level Characteristics B 9 1 Standard Mode ...
Page 14: ...Outdoor Unit 6 Operating Sound Level Characteristics B 10 2 Quiet Mode ...
Page 17: ...Control 1 System Block Diagram C 2C 2 ...
Page 18: ...Control Related 2 Remote Control Warning List C 3 ...
Page 19: ...Control Related 2 Remote Control Warning List C 4 ...
Page 20: ...Control Related 2 Remote Control Warning List C 5 ...
Page 41: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Page 42: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Page 43: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Page 51: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Page 52: ...Installation Work 3 Outdoor unit installation work E 14 ...
Page 53: ...Installation Work 3 Outdoor unit installation work E 15 ...
Page 54: ...Installation Work 3 Outdoor unit installation work E 16 ...
Page 55: ...Installation Work 3 Outdoor unit installation work E 17 ...
Page 56: ...Installation Work 3 Outdoor unit installation work E 18 ...
Page 57: ...Installation Work 3 Outdoor unit installation work E 19 ...
Page 58: ...Installation Work 3 Outdoor unit installation work E 20 ...
Page 59: ...Installation Work 3 Outdoor unit installation work E 21 ...
Page 60: ...Installation Work 3 Outdoor unit installation work E 22 ...
Page 61: ...Installation Work 3 Outdoor unit installation work E 23 ...
Page 62: ...Installation Work 3 Outdoor unit installation work E 24 ...
Page 63: ...Installation Work 3 Outdoor unit installation work E 25 ...
Page 64: ...Installation Work 3 Outdoor unit installation work E 26 ...
Page 65: ...Installation Work 3 Outdoor unit installation work E 27 ...
Page 66: ...Installation Work 3 Outdoor unit installation work E 28 ...
Page 67: ...Installation Work 3 Outdoor unit installation work E 29 ...
Page 68: ...Installation Work 3 Outdoor unit installation work E 30 ...
Page 69: ...Installation Work 3 Outdoor unit installation work E 31 ...
Page 70: ...Installation Work 3 Outdoor unit installation work E 32 ...
Page 71: ...Installation Work 3 Outdoor unit installation work E 33 ...