
Maintenance
SY16C Excavator OMM
5-28
Operation and Maintenance Manual — 0420
SANY
10. Remove the overflow tank (4) from the machine.
11. Drain the coolant into an appropriate container and
install the overflow tank.
12. Close the coolant drain valve. Add new engine coolant
until the level reaches the radiator filler opening. With
the radiator cap removed, run the engine at low idle for
5 minutes, and then at high speed for 5 minutes, to
bleed air from the cooling system.
13. Top off the radiator and fill the overflow tank until the
engine coolant is between the FULL (5) and LOW (6)
marks.
Inspect the Engine Coolant Pump
1. Prepare the machine for service. See “Maintenance Safety” on page 2-9.
2. The engine coolant pump is behind the engine cooling fan. Inspect the engine coolant pump for any signs of
engine coolant leaks.
3. If the fan pulley has any play, the bearings inside the engine coolant pump may be worn and the engine coolant
pump may need to be replaced.
Fig. 5-17
0005082
4
5
6
Summary of Contents for SY16C
Page 2: ...Page Intentionally Blank ...
Page 207: ...Page Intentionally Blank ...