background image

Step 6 - Projector Alignment

The VMPR1 can be adjusted for vertical elevation (

Pitch

), horizontal tilt (

Roll

), and rotation (

Yaw

).

Pitch Adjustment

Loosen the Pitch Adjustment Screws on both sides of the Adjustment Bracket (

D

) and adjust the projector to the desired 

Pitch; then, retighten the Pitch Adjustment Screws as shown in Diagram 6A.

Roll Adjustment

Loosen the Roll Adjustment Screws on both sides of the Adjustment Bracket (

D

) and adjust the projector to the desired angle 

and tilt; then, retighten the Roll Adjustment Screws as shown in Diagram 6A.

 

 

 

 

 

 

Diagram 6A

Yaw Adjustment

Lower the Top Cover (

H

) to expose the Lag Bolts (

U

).  Loosen the Lag Bolts and adjust the projector to the desired angle or 

yaw; then retighten the Lag Bolts and snap the Top Cover (

H

) back into place as shown in Diagram 6B.

 

 

 

 

 

 

Diagram 6B

Pitch Adjustment Screw

Roll Adjustment Screw

Lag Bolt (U)

Lag Bolt (U)

Top Cover (H)

Step 7 - Attach Bottom cover

Flex the Bottom Cover (

G

) at the seam, just enough to fit it around the Adjustment Bracket (

D

).  Align the seam in the least 

visible location, you may also stick a small piece of tape to the inside of the Bottom cover to secure the seam. 

 

 

 

 

 

 

 

Diagram 7

G

CSAV, Inc. and its affiliated corporations and subsidiaries (collectively, “CSAV”), intend to make this manual accurate and complete. However, CSAV makes no claim that the information contained herein 

covers all details, conditions, or variations. Nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to 
change without notice or obligation of any kind. CSAV makes no representation of warranty, expressed or implied, regarding the information contained herein. CSAV assumes no responsibility for accuracy, 

completeness or sufficiency of the information contained in this document.

Summary of Contents for VMPR1

Page 1: ...se directions or have any doubts about the safety of the installation please call a qualified contractor or contact Sanus at 800 359 5520 or www sanus com Check carefully to make sure that there are no missing or defective parts Our customer service representatives can quickly assist you with installation questions and missing or damaged parts Replacement parts for products purchased through autho...

Page 2: ...llen Key W Qty 1 Allen Key V Qty 1 VMPR1 Dimensional Drawings 470 15 mm 18 51 in Covering area with Extension Arms B installed 305 mm 12 01 in Covering area without Extension Arms B installed 117 3 mm 4 62 in TO 100 076 mm 3 94 in M3 x 10 mm O Qty 4 M6 x 12 mm R Qty 4 M5 x 12 mm Q Qty 4 M4 x 12 mm P Qty 4 M6 x 8 mm S Qty 2 Set Screw N Qty 1 ...

Page 3: ...an to mount the VMPR1 as shown in Diagram 1A Verify the stud location with an awl or thin nail NOTE Do not attach the Ceiling Plate C at this time Flat Ceilings Align the Ceiling Plate C with the two tabs aligned to the screen as shown in Diagram 1B Pre drill a 3 in 76 2 mm deep hole in the center of the framing member using a 3 16 in drill then using the Ceiling Plate C as a template pre drill a ...

Page 4: ...Projector Interface level with the projector Some Adjustable Feet may need to be at different heights NOTE If the mounting holes are closer than a five inch diameter lower the feet all the way to allow the Threaded Stud to swing under the Ceiling Plate C Determine the proper screw size and depth M3 x 10 mm O M4 x 12 mm P M5 x 12 mm Q or M6 x 12 mm R and corresponding Washers L M for projector moun...

Page 5: ...using Extension Pipe and NPT Adapter Vaulted or Cathedral Ceilings Place the Ceiling Plate C over the NPT Adapter E lining up the holes in both the Ceiling Plate and the NPT Adapter as shown in Diagram 3B Using the Allen Key V and the two Cap Screws I secure the Ceiling Plate C to the NPT Adapter E NOTE Set Screw J is shorter than Set Screw N NOTE When using the NPT Extension Pipe F the Set Screw ...

Page 6: ...aulted or Cathedral Ceilings Using the Lag Bolts U and Lag Bolt Washers T secure the VMPR1 Top Assembly to the framing member at the location selected in Step 1 Ceiling Preparation CAUTION Do not over tighten the lag Bolts U Tighten lag Bolts until they are pulled firmly against the ceiling Plate C If there is a layer of drywall or other material this drywall or other material may not exceed 5 8 i...

Page 7: ...ts K rotate into the Vee Slots of the Adjustment Bracket D as shown in Diagram 5A Once the desired position is located and the Tapered Nuts are tightened the projector may be removed for service and re installed without losing registration by simply rotating the projector Align the four Vee Slots of the Adjustment Bracket D with the Threaded Studs and Tapered Nuts K of the Universal Projector Inte...

Page 8: ...nt Screw Roll Adjustment Screw Lag Bolt U Lag Bolt U Top Cover H Step 7 Attach Bottom cover Flex the Bottom Cover G at the seam just enough to fit it around the Adjustment Bracket D Align the seam in the least visible location you may also stick a small piece of tape to the inside of the Bottom cover to secure the seam Diagram 7 G CSAV Inc and its affiliated corporations and subsidiaries collectiv...

Reviews: