Step 2: Attach Universal Projector Interface to Projector

Loosen, but do not remove the Acorn Nuts shown in Diagram 2A.

Place the Universal Projector Interface (

A

) on the projector, aligning the holes in the Adjustable Feet with the threaded holes 

in the projector and with the Threaded Suds in line as shown in Diagram 2A. If there are only three mounting points, remove 

one Leg from the Universal projector Interface by removing the Acorn Nut.
uds in line as shown in Diagram 2A. If there are only three mounting points, remove one Leg from the Universal projector 

Interface by removing the Acorn Nut.

If necessary, add Extension Arms (

B

) to the Universal Projector Interface (

A

) by removing the Adjustable feet and Installing 

them on the Extension Arms as shown in Diagram 2B.  

Secure  the  Extension  Arms  (

B

)  to  the  Universal  Projector  Interface,  using  the  M6  x  8  mm  (

S

)  screws  as  shown  in  

Diagram 2B.

Adjust the Adjustable Feet as shown in Diagram 2C, making sure to allow for proper air ventilation and keeping the Universal 

Projector Interface level with the projector. Some Adjustable Feet may need to be at different heights.

NOTE:

If the mounting holes are closer than a five inch diameter, lower the feet all the way to allow the Threaded Stud 

to swing under the Ceiling Plate (C)

.

Determine the proper screw size and depth, M3 x 10 mm (

O

), M4 x 12 mm (

P

), M5 x 12 mm (

Q

), or M6 x 12 mm (

R

), and 

corresponding Washers (

L

M

) for projector mounting.

Using correct Screws (

O,P,Q,R

) and Washers (

L,M

), secure the back two legs of the Universal Projector Interface (

A

) to the 

projector; then, secure the front legs.

Move the Universal Projector Interface (

A

) to the center of gravity of the projector. You can locate the center of gravity by 

attempting to lift the projector straight up. If it feels like it wants to twist, move the Universal Projector Interface toward the 

heavy side. When the projector feels balanced, you have located the center of gravity.

Threaded

Studs

Acorn

Nut

Acorn

Nut

Adjustable

Foot

Hex Nut

on all 

Adjustable Feet

Adjustable

Foot

Diagram 2C

Install 

M6 x 8 mm

Screw (S) 

Remove 

Adjustable Foot 

and install here

Rotate Adjustable Foot left or 

right to increase or decrease 

length. Each rotation equals 

0.625” [15.80 mm].

Hex Nut

on all 

Adjustable Feet

Summary of Contents for VMPR1

Page 1: ...se directions or have any doubts about the safety of the installation please call a qualified contractor or contact Sanus at 800 359 5520 or www sanus com Check carefully to make sure that there are no missing or defective parts Our customer service representatives can quickly assist you with installation questions and missing or damaged parts Replacement parts for products purchased through autho...

Page 2: ...llen Key W Qty 1 Allen Key V Qty 1 VMPR1 Dimensional Drawings 470 15 mm 18 51 in Covering area with Extension Arms B installed 305 mm 12 01 in Covering area without Extension Arms B installed 117 3 mm 4 62 in TO 100 076 mm 3 94 in M3 x 10 mm O Qty 4 M6 x 12 mm R Qty 4 M5 x 12 mm Q Qty 4 M4 x 12 mm P Qty 4 M6 x 8 mm S Qty 2 Set Screw N Qty 1 ...

Page 3: ...an to mount the VMPR1 as shown in Diagram 1A Verify the stud location with an awl or thin nail NOTE Do not attach the Ceiling Plate C at this time Flat Ceilings Align the Ceiling Plate C with the two tabs aligned to the screen as shown in Diagram 1B Pre drill a 3 in 76 2 mm deep hole in the center of the framing member using a 3 16 in drill then using the Ceiling Plate C as a template pre drill a ...

Page 4: ...Projector Interface level with the projector Some Adjustable Feet may need to be at different heights NOTE If the mounting holes are closer than a five inch diameter lower the feet all the way to allow the Threaded Stud to swing under the Ceiling Plate C Determine the proper screw size and depth M3 x 10 mm O M4 x 12 mm P M5 x 12 mm Q or M6 x 12 mm R and corresponding Washers L M for projector moun...

Page 5: ...using Extension Pipe and NPT Adapter Vaulted or Cathedral Ceilings Place the Ceiling Plate C over the NPT Adapter E lining up the holes in both the Ceiling Plate and the NPT Adapter as shown in Diagram 3B Using the Allen Key V and the two Cap Screws I secure the Ceiling Plate C to the NPT Adapter E NOTE Set Screw J is shorter than Set Screw N NOTE When using the NPT Extension Pipe F the Set Screw ...

Page 6: ...aulted or Cathedral Ceilings Using the Lag Bolts U and Lag Bolt Washers T secure the VMPR1 Top Assembly to the framing member at the location selected in Step 1 Ceiling Preparation CAUTION Do not over tighten the lag Bolts U Tighten lag Bolts until they are pulled firmly against the ceiling Plate C If there is a layer of drywall or other material this drywall or other material may not exceed 5 8 i...

Page 7: ...ts K rotate into the Vee Slots of the Adjustment Bracket D as shown in Diagram 5A Once the desired position is located and the Tapered Nuts are tightened the projector may be removed for service and re installed without losing registration by simply rotating the projector Align the four Vee Slots of the Adjustment Bracket D with the Threaded Studs and Tapered Nuts K of the Universal Projector Inte...

Page 8: ...nt Screw Roll Adjustment Screw Lag Bolt U Lag Bolt U Top Cover H Step 7 Attach Bottom cover Flex the Bottom Cover G at the seam just enough to fit it around the Adjustment Bracket D Align the seam in the least visible location you may also stick a small piece of tape to the inside of the Bottom cover to secure the seam Diagram 7 G CSAV Inc and its affiliated corporations and subsidiaries collectiv...