THE BENCHMARK SCHEME
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers
are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in
accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of
the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with
Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the
Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage
and promote the Scheme. Visit www.centralheating.co.uk for more information.
IMPORTANT NOTE TO USER: PLEASE REFER TO THE USER INSTRUCTIONS SECTION ON PAGES 22 AND 23 FOR
IMPORTANT INFORMATION WITH RESPECT TO THE BENCHMARK SCHEME
INTRODUCTION
The Santon PremierPlus cylinder is a purpose
designed unvented water heater. The unit has a
stainless steel inner vessel, which ensures an excellent
standard of corrosion resistance. The outer casing is
a combination of resilient thermoplastic mouldings
and plastic coated corrosion proofed steel sheet. All
products are insulated with CFC free polyurethane
foam to give good heat loss performance. (See Table
6, page 18)
The unit is supplied complete with all the necessary
safety and control devices needed to allow connection
to the cold water PremierPlus. All these components
are preset and not adjustable.
This appliance complies with the requirements of the
CE marking directive and is Kiwa approved to show
compliance with Building Regulations (Section G3).
The following instructions are offered as a guide to
installation which must be carried out by a competent
plumbing and electrical installer in accordance with
Building Regulation G3, The Building Standards
(Scotland) Regulations 1990, or The Building
Regulations (Northern Ireland).
NOTE:
Prior to installation the unit should be stored
in an upright position in an area free from excessive
damp or humidity.
CONTENTS
INTRODUCTION ......................................... 2
GENERAL REQUIREMENTS........................... 3
INSTALLATION – GENERAL ......................... 4
INSTALLATION - DISCHARGE ..................... 7
INSTALLATION - DIRECT UNITS .................. 10
INSTALLATION - INDIRECT UNITS .............. 11
COMMISSIONING ..................................... 13
MAINTENANCE .......................................... 14
USER INSTRUCTIONS ................................. 15
FAULT FINDING & SERVICING .................... 16
SPARE PARTS .............................................. 17
HEAT LOSS ................................................. 18
ENVIROMENTAL INFORMATION................. 18
GUARANTEE .............................................. 19
COMMISSIONING CHECK LIST .................. 22
SERVICE RECORD ....................................... 23
TECHNICAL SUPPORT ................................ 24